Planning application
PLOTS 1 AND 2 AT 65, St Leonards Drive, Chapel St Leonards
Works: Loft or dormer Demolition Windows or glazing Domestic
Read from the description, not a valuation. How we read the register
Relates to N/031/01095/04
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Planning Permission - Erection of 2 no. detached dwellings with rooms in the roof space and provision of dormer windows with an attached single garage, construction of vehicular and pedestrian accesses, existing dwelling on site to be demolished, which is an amendment to that previously approved under planning permission reference N/031/01095/04 (Plots 1 and 2 only).
As published by the council, reference N/031/02018/06
Application record
- Reference
- N/031/02018/06
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approved
- Received
- 9 Aug 2006
- Validated
- 9 Aug 2006
- Decided
- 23 Mar 2007
- Parish
- Chapel St. Leonards
- Decision by
- Delegated
Timeline
Dates from the published record
-
9 Aug 2006
Received by East Lindsey
-
23 Mar 2007
Decision issued: Approved
-
22 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
N/031/01095/04 Granted
65 St Leonards Drive, Chapel St. Leonards, SKEGNESS, PE24 5RG
Planning Permission - Erection of 4 no. dwellings with rooms in the roof space and dormer windows on site of an existing dwelling which is to be demolished and construction of a vehicular access in accordance with amended plans received by the Local Planning Authority on 17th March, 2005.
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
East Lindsey granted permission on 23 March 2007, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In East Lindsey
-
01133/26/FUL Granted
56 Queen Street Horncastle Lincolnshire LN9 6BG
Planning Permission - Alterations to existing dwelling to provide replacement rear doors and to include blocking up of 2no. existing windows.
-
01086/26/FUL Granted
South View Peppin Lane Fotherby Lincolnshire LN11 0UW
Planning Permission - Alterations to existing conservatory to provide replacement roof and wall frames.
-
03860/25/FUL Granted
The Pavilion London Road Louth Lincolnshire LN11 9QP
Planning Permission - Erection of outdoor padel court with floodlighting.
-
00731/26/FUL Withdrawn
35 High Street Wainfleet Lincolnshire PE24 4BJ
Planning Permission - External alterations to existing coffee shop which is a listed building including the siting of an external flu pipe.
-
00704/26/FUL Granted
Eastfield Lodge Caravan And Camping Site Alford Road Sutton On Sea Lincolnshire LN12 2RL
Planning Permission - Change of use of land for the siting of 10no. touring caravans pitches and extension to the existing amenity building to provide a shop and construction of an internal access road.