Skip to content
PlanIndex Get alerts
Menu

Planning application

3/26/0785/FUL

Premier Court Residential And Nursing Home Thorley Lane East Thorley Bishops Stortford Hertfordshire CM23 4BH

Awaiting decision East Hertfordshire Full Application

Proposal

Retrospective installation of solar photovoltaic panels. Installation of external battery storage unit with acoustic enclosure at ground level with associated alterations.

As published by the council, reference 3/26/0785/FUL

Timeline

Dates from the published record

  1. 3 Jun 2026

    Received by East Hertfordshire

  2. 24 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with East Hertfordshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 3/26/0737/HH Awaiting decision

    Stone Hall Thorley Lane East Thorley Bishops Stortford Hertfordshire CM23 4BH

    Installation of a freestanding greenhouse

    22 May 2026 0m away Householder
  • 3/26/0736/CLEO Awaiting decision

    Stone Hall Thorley Lane East Thorley Bishops Stortford Hertfordshire CM23 4BH

    Certificate of Lawful Existing Use or Development to confirm that the land has been used continuously as part of the residential curtilage and lawful planning unit associated with Stone Hall for a period in excess of ten years

    22 May 2026 0m away Amendments
  • 3/22/0346/FUL Granted

    Thorley Place Thorley Lane East Thorley Bishops Stortford Hertfordshire CM23 4BH

    Conversion of dwelling into nine apartments including extensions and alterations, with garaging and ancillary outbuilding.

    15 Feb 2022 72m away Full applications
  • 3/07/1620/FP Granted

    25, Cedar Park, Bishops Stortford, Herts, CM23 4JU

    Two storey rear extension

    2 Aug 2007 175m away Full applications
  • 3/22/2234/CLPO Granted

    45 Walnut Drive Bishops Stortford Hertfordshire CM23 4JT

    Garage conversion to residential annexe with roof light to front and new window to side.

    24 Oct 2022 262m away Outline
  • 3/26/0354/HH Awaiting decision

    15 Milliners Way Bishops Stortford Hertfordshire CM23 4GG

    Construction of single storey side/rear extension and alterations to fenestration

    12 Mar 2026 284m away Householder

In East Hertfordshire

  • 3/26/0679/FUL Granted

    Gu Indulgent Foods Dunmow Road Bishops Stortford Hertfordshire CM23 5PA

    Creation of water treatment facility and concrete bund within existing industrial site

    12 May 2026 Full applications
  • 3/26/0639/FUL Granted

    Riverside Wharf Riverside Bishops Stortford Hertfordshire CM23 3GN

    Facade remediation works including replacement of existing render system, of existing timber cladding, of existing timber balcony decking, of existing infill panel boards and replacement of existing soffit within the courtyard

    7 May 2026 Full applications
  • 3/26/0734/FUL Withdrawn

    Snow End House Anstey Hertfordshire SG9 0DJ

    Installation of an array of 24 solar panels including batteries for storage to be sited behind the panels

    22 May 2026 Full applications
  • 3/26/0691/FUL Refused

    The Brooms 69 Lower Road Great Amwell Hertfordshire SG12 9SZ

    Erection of 2no. self-build and custom eco dwellings with associated landscape, ASHP and solar panels

    14 May 2026 Full applications
  • 3/25/2026/FUL Refused

    Westmill Farmhouse Westmill Road Westmill Ware Hertfordshire SG12 0ES

    Erection of two enclosed padel courts over partial golf course, including installation of glass and wire mesh enclosures, associated hardsurfacing, eight low-level LED floodlights and compensatory grassland

    24 Dec 2025 Full applications