Skip to content
PlanIndex Get alerts
Menu

Planning application

Adams Barn Hunsdon Road Widford Hertfordshire

Refused East Hertfordshire 3/24/0926/FUL Full Application

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Change of use and conversion of agricultural barn to create 1 residential dwelling.

As published by the council, reference 3/24/0926/FUL

Application record

Reference
3/24/0926/FUL
Type
Full Application
Status
Decided
Decision
Refuse
Received
14 May 2024
Validated
10 Jun 2024
Decided
22 Nov 2024
Ward
Ware Rural
Parish
Widford Parish Council
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 14 May 2024

    Received by East Hertfordshire

  2. 10 Jun 2024

    Validated

    Checked as complete and ready for consideration.

  3. 22 Nov 2024

    Decision issued: Refuse

  4. 8 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In East Hertfordshire

  • 3/26/0113/FUL Refused

    Land To The East Of Cambridge Road And North Of Standon Hill Puckeridge Hertfordshire SG11 1DQ

    Battery energy storage facility and all associated works

    28 Jan 2026 Full applications
  • 3/26/1186/FUL Awaiting decision

    Saracens Head Bridge Foot Ware Hertfordshire SG12 9BS

    Extension to the outdoor riverside seating area, including decking, balustrade and soft landscaping

    25 Aug 2026 Full applications
  • 3/26/0466/FUL Refused

    37A High Street Buntingford Hertfordshire SG9 9AD

    Erection of timber frame outbuilding for use as a staff area (Retrospective)

    1 Apr 2026 Full applications
  • 3/26/1166/FUL Awaiting decision

    Land Adjacent To Maze Green Road Bishops Stortford Hertfordshire CM23 2PJ

    Proposed electrical transformer and panel in GRP housing, with cable connections to existing sub-station, and mitigation planting

    20 Aug 2026 Full applications
  • 3/26/1149/FUL Awaiting decision

    Hartfield Court Collett Road Ware SG12 7LT

    Replacement access bridge

    17 Aug 2026 Full applications