Planning application

Anstey Hall Anstey Buntingford Hertfordshire SG9 0BY

Withdrawn East Hertfordshire 3/23/0659/FUL Full Application

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Planning application for the erection of a barn and the replacement of an existing equine arena (40m x 20m) to create a 40m x 30m equine arena.

As published by the council, reference 3/23/0659/FUL

Application record

Reference
3/23/0659/FUL
Type
Full Application
Status
Withdrawn
Decision
Application Withdrawn by Applicant/Agent
Received
3 Apr 2023
Validated
12 Apr 2023
Decided
25 Apr 2023
Ward
Braughing
Parish
Anstey Parish Council
Postcode
SG9 0BY

Timeline

Dates from the published record

  1. 3 Apr 2023

    Received by East Hertfordshire

  2. 12 Apr 2023

    Validated

    Checked as complete and ready for consideration.

  3. 25 Apr 2023

    Decision issued: Application Withdrawn by Applicant/Agent

  4. 31 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What withdrawal means

The process from here

The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.

The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In East Hertfordshire

  • 3/26/0113/FUL Refused

    Land To The East Of Cambridge Road And North Of Standon Hill Puckeridge Hertfordshire SG11 1DQ

    Battery energy storage facility and all associated works

    28 Jan 2026 Full applications
  • 3/26/0466/FUL Refused

    37A High Street Buntingford Hertfordshire SG9 9AD

    Erection of timber frame outbuilding for use as a staff area (Retrospective)

    1 Apr 2026 Full applications
  • 3/26/1166/FUL Awaiting decision

    Land Adjacent To Maze Green Road Bishops Stortford Hertfordshire CM23 2PJ

    Proposed electrical transformer and panel in GRP housing, with cable connections to existing sub-station, and mitigation planting

    20 Aug 2026 Full applications
  • 3/26/0431/FUL Withdrawn

    2 Home Farm Court High Street Puckeridge Hertfordshire SG11 1UU

    Conversion of incidental office/storage space above existing garages into a self-contained one bedroom flat with associated parking, insertion of rooflights and alteration to the upper floor window.

    26 Mar 2026 Full applications
  • 3/25/1978/FUL Granted

    Gates Of Hertford Gascoyne Way Hertford Hertfordshire SG13 8EL

    Change of use from Class E(a) retail to flexible Class E (Commercial, Business and Service)

    18 Dec 2025 Full applications