Skip to content
PlanIndex Get alerts
Menu

Planning application

Grudds Farm, Green Tye, Much Hadham, Hertfordshire, SG10 6JP

Granted East Hertfordshire 3/08/0722/FP Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of redundant agricultural to building B8 storage / distribution - Retrospective.

As published by the council, reference 3/08/0722/FP

Application record

Reference
3/08/0722/FP
Type
Full Application
Status
Decided
Decision
Grant Plan Permission w Conds
Received
15 Apr 2008
Validated
1 May 2008
Decided
25 Jun 2008
Ward
Much Hadham
Parish
Much Hadham Parish Council
Decision by
Delegated Decision
Postcode
SG10 6JP

Timeline

Dates from the published record

  1. 15 Apr 2008

    Received by East Hertfordshire

  2. 1 May 2008

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jun 2008

    Decision issued: Grant Plan Permission w Conds

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In East Hertfordshire

  • 3/26/0113/FUL Refused

    Land To The East Of Cambridge Road And North Of Standon Hill Puckeridge Hertfordshire SG11 1DQ

    Battery energy storage facility and all associated works

    28 Jan 2026 Full applications
  • 3/26/0466/FUL Refused

    37A High Street Buntingford Hertfordshire SG9 9AD

    Erection of timber frame outbuilding for use as a staff area (Retrospective)

    1 Apr 2026 Full applications
  • 3/26/1166/FUL Awaiting decision

    Land Adjacent To Maze Green Road Bishops Stortford Hertfordshire CM23 2PJ

    Proposed electrical transformer and panel in GRP housing, with cable connections to existing sub-station, and mitigation planting

    20 Aug 2026 Full applications
  • 3/26/0431/FUL Withdrawn

    2 Home Farm Court High Street Puckeridge Hertfordshire SG11 1UU

    Conversion of incidental office/storage space above existing garages into a self-contained one bedroom flat with associated parking, insertion of rooflights and alteration to the upper floor window.

    26 Mar 2026 Full applications
  • 3/25/1978/FUL Granted

    Gates Of Hertford Gascoyne Way Hertford Hertfordshire SG13 8EL

    Change of use from Class E(a) retail to flexible Class E (Commercial, Business and Service)

    18 Dec 2025 Full applications