Planning application
Opp: New Barn Cottages, Flint Hall, Hormead Road, Anstey, Herts
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of new building for the storage of grain and agricultural machinery
As published by the council, reference 3/08/0425/FP
Application record
- Reference
- 3/08/0425/FP
- Type
- Full Application
- Status
- Decided
- Decision
- Grant Plan Permission w Conds
- Received
- 3 Mar 2008
- Validated
- 4 Apr 2008
- Decided
- 7 Jul 2008
- Ward
- Braughing
- Parish
- Anstey Parish Council
- Decision by
- Committee Decision
Timeline
Dates from the published record
-
3 Mar 2008
Received by East Hertfordshire
-
4 Apr 2008
Validated
Checked as complete and ready for consideration.
-
7 Jul 2008
Decision issued: Grant Plan Permission w Conds
-
19 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
1,780 applications on PlanIndex · across 174 councils · 92% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
East Hertfordshire granted permission on 7 July 2008, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
New Barns Farm, New Barns Lane, Anstey
Change of use & alteration of redundant farm buildings to office, workshop and studio space to be used in assocaition with Stagestruck Ltd.
Granted Full applications 2 docs -
New Barns Farm, New Barns Lane, Anstey
Change of use & alteration of redundant farm buildings to office, workshop and studio space to be used in association with Stagestruck Ltd
Withdrawn Full applications
Other full applications
In East Hertfordshire
-
3/26/0113/FUL Refused
Land To The East Of Cambridge Road And North Of Standon Hill Puckeridge Hertfordshire SG11 1DQ
Battery energy storage facility and all associated works
-
3/26/1186/FUL Awaiting decision
Saracens Head Bridge Foot Ware Hertfordshire SG12 9BS
Extension to the outdoor riverside seating area, including decking, handrail and balustrade, fencing, gate, steps, and soft landscaping.
-
3/26/0466/FUL Refused
37A High Street Buntingford Hertfordshire SG9 9AD
Erection of timber frame outbuilding for use as a staff area (Retrospective)
-
3/26/1166/FUL Awaiting decision
Land Adjacent To Maze Green Road Bishops Stortford Hertfordshire CM23 2PJ
Proposed electrical transformer and panel in GRP housing, with cable connections to existing sub-station, and mitigation planting
-
3/26/1149/FUL Awaiting decision
Hartfield Court Collett Road Ware SG12 7LT
Replacement access bridge