Skip to content
PlanIndex Get alerts
Menu

Planning application

Manor Farm, Mill Lane, Meesden, Herts, SG9 0BB

Granted East Hertfordshire 3/07/0951/FP Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey side extension

As published by the council, reference 3/07/0951/FP

Application record

Reference
3/07/0951/FP
Type
Full Application
Status
Decided
Decision
Grant Plan Permission w Conds
Received
8 May 2007
Validated
23 May 2007
Decided
16 Jul 2007
Ward
Braughing
Parish
Meesden Parish Council
Decision by
Delegated Decision
Postcode
SG9 0BB

Timeline

Dates from the published record

  1. 8 May 2007

    Received by East Hertfordshire

  2. 23 May 2007

    Validated

    Checked as complete and ready for consideration.

  3. 16 Jul 2007

    Decision issued: Grant Plan Permission w Conds

  4. 8 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Manor Farm, Mill Lane, Meesden, Herts, SG9 0BB

    3/07/0952/LB Submitted 8 May 2007 0m away

    Repairs to south gable end and single storey extension to same end including re-forming window opening in first floor room and reducing floor level in ground floor room to approx former level. Insertion of stud partition in bedroom to form corridor.

    Granted Heritage and listed buildings Extension Windows or glazing 6 docs
    Small domestic
  • Fox Lodge Mill Lane Meesden Buntingford Hertfordshire SG9 0BB

    3/21/1145/CLPO Submitted 30 Apr 2021 67m away

    Installation of solar panels.

    Granted Outline 12 docs
  • The Sycamores Mill Lane Meesden Hertfordshire SG9 0BB

    3/24/1744/HH Submitted 13 Sep 2024 85m away

    Garage conversion with new window to side and alterations to front and rear fenestration.

    Granted Householder Windows or glazing 11 docs
    Small domestic
  • Yew Tree Cottage Mill Lane Meesden Buntingford Hertfordshire SG9 0BB

    3/23/0289/HH Submitted 16 Feb 2023 132m away

    Demolition of outbuilding, erection of new ancillary annexe outbuilding with home office and garden room.

    Withdrawn Householder Demolition 15 docs
    Small domestic
  • Old Yew Court, Meesden, Buntingford, SG9 0BB

    3/07/0740/FP Submitted 13 Apr 2007 136m away

    Single storey front extension with new porch, two storey rear extension and conservatory with dormer window.

    Granted Full applications Extension Loft or dormer +1 3 docs
    Small domestic
  • Home Farm, Mill Lane, Meesden, Herts, SG9 0BB

    3/07/0971/FP Submitted 9 May 2007 197m away

    Removal of existing garage & erection of new double garage with additional log store ( amended scheme)

    Granted Full applications 4 docs

In East Hertfordshire

  • 3/26/0113/FUL Refused

    Land To The East Of Cambridge Road And North Of Standon Hill Puckeridge Hertfordshire SG11 1DQ

    Battery energy storage facility and all associated works

    28 Jan 2026 Full applications
  • 3/26/1186/FUL Awaiting decision

    Saracens Head Bridge Foot Ware Hertfordshire SG12 9BS

    Extension to the outdoor riverside seating area, including decking, balustrade and soft landscaping

    25 Aug 2026 Full applications
  • 3/26/0466/FUL Refused

    37A High Street Buntingford Hertfordshire SG9 9AD

    Erection of timber frame outbuilding for use as a staff area (Retrospective)

    1 Apr 2026 Full applications
  • 3/26/1166/FUL Awaiting decision

    Land Adjacent To Maze Green Road Bishops Stortford Hertfordshire CM23 2PJ

    Proposed electrical transformer and panel in GRP housing, with cable connections to existing sub-station, and mitigation planting

    20 Aug 2026 Full applications
  • 3/26/1149/FUL Awaiting decision

    Hartfield Court Collett Road Ware SG12 7LT

    Replacement access bridge

    17 Aug 2026 Full applications