Skip to content
PlanIndex Get alerts
Menu

Planning application

South Midlands Co-Operative, 19, Bengeo Street, Hertford, SG143ES

Granted East Hertfordshire 3/07/0763/FP Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retrospective application for installation of refrigeration plant to rear of store

As published by the council, reference 3/07/0763/FP

Application record

Reference
3/07/0763/FP
Type
Full Application
Status
Decided
Decision
Grant Plan Permission w Conds
Received
16 Apr 2007
Validated
1 May 2007
Decided
25 Jun 2007
Ward
Hertford - Bengeo
Parish
Hertford Town Council
Decision by
Delegated Decision
Postcode
SG14 3ES

Timeline

Dates from the published record

  1. 16 Apr 2007

    Received by East Hertfordshire

  2. 1 May 2007

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jun 2007

    Decision issued: Grant Plan Permission w Conds

  4. 31 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

1 document on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 17 Bengeo Street Hertford Hertfordshire SG14 3ES

    3/21/1110/HH Submitted 28 Apr 2021 21m away

    Two storey and single storey rear extension. Loft conversion with rear dormer, front and side roof light windows. New first floor side windows.

    Refused Householder Extension Loft or dormer +1 9 docs
    Small domestic
  • 1 Bengeo Street Hertford Hertfordshire SG14 3ES

    3/24/1675/HH Submitted 5 Sep 2024 69m away

    Proposed single storey rear extension

    Granted Householder Extension 8 docs
    Small domestic
  • Old Coach House 2B Bengeo Street Hertford Hertfordshire SG14 3ES

    3/26/0657/HH Submitted 8 May 2026 69m away

    84% historically approved · decision due ~3 Aug

    Demolition of existing buildings and replace with double garage and turning area

    Withdrawn Householder Demolition
    Domestic
  • 33 Duncombe Road Hertford Hertfordshire SG14 3BZ

    3/21/0553/HH Submitted 4 Mar 2021 74m away

    Single storey rear extension and loft conversion with rear dormer window and front roof lights.

    Granted Householder Extension Loft or dormer +1 11 docs
    Small domestic
  • 49, Bengeo Street, Hertford, SG143ET

    3/07/0628/CL Submitted 26 Mar 2007 80m away

    Enlargement of existing rear single storey part of orginal house & new front porch. Rear enlargement is to increase size of kitchen.

    Granted Lawful development Extension 4 docs
    Small domestic
  • 62, Duncombe Road, Hertford, Herts, SG14 3BY

    3/07/1584/LC Submitted 30 Jul 2007 85m away

    Demolition of existing single storey flat roofed rear extension. Remove existing brick wall running from extension to Westfield Road boundary.

    Granted Heritage and listed buildings Extension Demolition 4 docs
    Small domestic

In East Hertfordshire

  • 3/26/0113/FUL Refused

    Land To The East Of Cambridge Road And North Of Standon Hill Puckeridge Hertfordshire SG11 1DQ

    Battery energy storage facility and all associated works

    28 Jan 2026 Full applications
  • 3/26/0466/FUL Refused

    37A High Street Buntingford Hertfordshire SG9 9AD

    Erection of timber frame outbuilding for use as a staff area (Retrospective)

    1 Apr 2026 Full applications
  • 3/26/1166/FUL Awaiting decision

    Land Adjacent To Maze Green Road Bishops Stortford Hertfordshire CM23 2PJ

    Proposed electrical transformer and panel in GRP housing, with cable connections to existing sub-station, and mitigation planting

    20 Aug 2026 Full applications
  • 3/26/0431/FUL Withdrawn

    2 Home Farm Court High Street Puckeridge Hertfordshire SG11 1UU

    Conversion of incidental office/storage space above existing garages into a self-contained one bedroom flat with associated parking, insertion of rooflights and alteration to the upper floor window.

    26 Mar 2026 Full applications
  • 3/25/1978/FUL Granted

    Gates Of Hertford Gascoyne Way Hertford Hertfordshire SG13 8EL

    Change of use from Class E(a) retail to flexible Class E (Commercial, Business and Service)

    18 Dec 2025 Full applications