Skip to content
PlanIndex Get alerts
Menu

Planning application

1, Great Molewood, Hertford, SG142PN

Granted East Hertfordshire 3/07/0564/FP Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replace summer house

As published by the council, reference 3/07/0564/FP

Application record

Reference
3/07/0564/FP
Type
Full Application
Status
Decided
Decision
Grant Plan Permission w Conds
Received
19 Mar 2007
Validated
11 Apr 2007
Decided
30 May 2007
Ward
Hertford - Bengeo
Parish
Hertford Town Council
Decision by
Delegated Decision
Postcode
SG14 2PN

Timeline

Dates from the published record

  1. 19 Mar 2007

    Received by East Hertfordshire

  2. 11 Apr 2007

    Validated

    Checked as complete and ready for consideration.

  3. 30 May 2007

    Decision issued: Grant Plan Permission w Conds

  4. 31 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 7, Great Molewood, Hertford, Herts, SG14 2PN

    3/07/1625/FP Submitted 3 Aug 2007 45m away

    Single storey rear extension

    Granted Full applications Extension
    Small domestic
  • 5 Great Molewood Hertford Hertfordshire SG14 2PN

    3/24/1652/FUL Submitted 3 Sep 2024 94m away

    Replacement of existing dwelling and garage with new dwelling.

    Refused Full applications New dwelling 30 docs
    Domestic
  • 5 Great Molewood Hertford Hertfordshire SG14 2PN

    3/26/1157/CLEO Submitted 19 Aug 2026 96m away

    80% historically approved · decision due ~14 Oct

    Certificate of lawfulness for existing construction of a single-storey rear extension, garage conversion, alterations to fenestration enlargement of roof with a rear dormer and pitched-roof and installation of loft windows, and removal of existing chimney stack

    Awaiting decision Extension Loft or dormer +1 6 docs
    Small domestic
  • 12, Great Molewood, Hertford, SG142PN

    3/07/0684/FP Submitted 2 Apr 2007 135m away

    Addition of small conservatory at rear of property and forming of new door to house from existng window

    Granted Full applications Extension Windows or glazing 8 docs
  • 190 North Road Hertford Hertfordshire SG14 2PJ

    3/26/0393/FUL Submitted 20 Mar 2026 157m away

    Removal of existing storage facilities and construction of a new dwelling with green roof and solar panels and associated garage and gates.

    Granted Full applications New dwelling 27 docs
    Domestic
  • 23, Great Molewood, Hertford, Herts, SG14 2PN

    3/08/0434/FP Submitted 4 Mar 2008 190m away

    Double storey front extension to replace the existing garage

    Granted Full applications Extension 2 docs

In East Hertfordshire

  • 3/26/0113/FUL Refused

    Land To The East Of Cambridge Road And North Of Standon Hill Puckeridge Hertfordshire SG11 1DQ

    Battery energy storage facility and all associated works

    28 Jan 2026 Full applications
  • 3/26/0466/FUL Refused

    37A High Street Buntingford Hertfordshire SG9 9AD

    Erection of timber frame outbuilding for use as a staff area (Retrospective)

    1 Apr 2026 Full applications
  • 3/26/1166/FUL Awaiting decision

    Land Adjacent To Maze Green Road Bishops Stortford Hertfordshire CM23 2PJ

    Proposed electrical transformer and panel in GRP housing, with cable connections to existing sub-station, and mitigation planting

    20 Aug 2026 Full applications
  • 3/26/1149/FUL Awaiting decision

    Hartfield Court Collett Road Ware SG12 7LT

    Replacement access bridge

    17 Aug 2026 Full applications
  • 3/26/0431/FUL Withdrawn

    2 Home Farm Court High Street Puckeridge Hertfordshire SG11 1UU

    Conversion of incidental office/storage space above existing garages into a self-contained one bedroom flat with associated parking, insertion of rooflights and alteration to the upper floor window.

    26 Mar 2026 Full applications