Skip to content
PlanIndex Get alerts
Menu

Planning application

EHDC-25-1292-OUT

Car Park Ryebridge Lane, Upper Froyle, Alton, Hampshire, GU34 4LA

Decided East Hampshire Outline Planning Permission

Proposal

Outline planning permission for two dwellings with all matters reserved excluding access.

As published by the council, reference EHDC-25-1292-OUT

Timeline

Dates from the published record

  1. 3 Nov 2025

    Received by East Hampshire

  2. 25 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 2, St. Josephs Cottages Ryebridge Lane, Upper Froyle, Alton, Hampshire, GU34 4JY

    T1 - Eucalyptus - remove. Tree is leaning on a wall which has become cracked and tree is leaning over a road.

    28 Oct 2025 94m away Trees
  • The Hayloft Burnham Square, Upper Froyle, Alton, Hampshire, GU34 4FB

    A large limb of the willow tree (T50 on sketch) has snapped and fallen in the storms in October 2025, leaving additional limbs unstable. We would like to remove unstable limbs and a whole crown reduction (by approx. 40%) to reduce the weight. Other limbs are now unstable and have an increased danger of falling - potentially damaging our fences/walls and neighbours property on two sides, as well as presenting danger to our small children, who are regularly in the garden.

    17 Nov 2025 112m away Trees
  • Selbourne House Oast Lane, Upper Froyle, Alton, Hampshire, GU34 4JW

    Works to Tree(s) T1, T2 Whitebeams, T3 sweet chestnut, T4 Ash

    6 Mar 2026 189m away Trees
  • Froyle Cottage Ryebridge Lane, Upper Froyle, Alton, Hampshire, GU34 4JX

    Replacement windows

    4 Aug 2025 193m away Heritage and listed buildings
  • OLD DAIRY Ryebridge Lane, Upper Froyle, Alton, Hampshire, GU34 4JP

    Erection of extensions and alterations to the existing dwelling

    12 Dec 2025 274m away Householder
  • 2, HOME FARM COTTAGES Spollycombe Lane, Upper Froyle, Alton, Hampshire, GU34 4JS

    T1- Damson - remove and replace tree entirely with something smaller and more suited to location.

    24 Sep 2025 304m away Trees

In East Hampshire

  • Primary School Site, Walter Kimber Way, Horndean, PO8 0SQ

    New 1.5 form entry primary school with a 10 place resource provision, located within the Land East of Horndean development, known as Hazelton Meadow

    8 Jul 2026 Outline
  • Unit 7 Waterbrook Estate Waterbrook Road Waterbrook Road , Alton, GU34 2UD

    Change of use (with associated building modifications) from existing builders storage depot to a waste recycling facility to accept and process commercial and industrial waste (including the use of a waste picking station and trommel) on industrial land at the former sewage works off Waterbrook Road, Alton. [Section 73A application for variation of conditions] at Unit 7, Waterbrook Estate, Waterbrook Road, Alton, GU34 2UD

    11 Jun 2026 Outline
  • Unit 5 Waterbrook Estate Waterbrook Road Waterbrook Road, Alton, Hampshire, GU34 2UD

    Retention of Waste Recycling Centre for construction & demolition waste to include a lightweight structure, landscaped bund, parking and associated plant and machinery [Section 73 application for variation of conditions 2 (Site Layout and Buffer Zone), 11 (Dust and Noise Management Plan), 14 (Acoustic fencing and dust netting), 26 (Approved Plans) of 51471/009

    11 Jun 2026 Outline
  • HOLLYWATER SCHOOL Mill Chase Road, Bordon, Hampshire, GU35 0HA

    Planning permission is sought specifically for; - The conversion of 10 car parking spaces into 8 accessible spaces - The reprovision of the two parking spaces lost in the conversion - Provision of 1 additional parking space

    27 May 2026 Outline
  • NEW BARN FARM Alton Lane, Four Marks, Alton, Hampshire, GU34 5AJ

    EIA Screening request for proposed development at Land Off Alton Way, Four Marks, Hampshire. This request is made pursuant of Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as updated) (‘the 2017 EIA Regulations’)

    15 May 2026 Outline