Planning application
Glenmill Works Strathblane Road Campsie Glen Lennoxtown East Dunbartonshire G66 7AA
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed change of use to part of factory to dwelling house and remainder of factory to class 4 use.
As published by the council, reference TP/ED/25/0667
Application record
- Reference
- TP/ED/25/0667
- Type
- Full planning permission
- Status
- Awaiting decision
- Received
- 8 Dec 2025
- Validated
- 8 Dec 2025
- Ward
- Bishopbriggs North And Campsie
- Parish
- Campsie Community Council
- Postcode
- G66 7AA
Timeline
Dates from the published record
-
8 Dec 2025
Received by East Dunbartonshire
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Dunbartonshire took a median of 65 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
24 documents on file for this application
- PL25 SEPA REGISTRATION
- PL26 EXISTING AND PROPOSED ELEVATIONS
- PL27 PROPOSED GROUND FLOOR PLAN
- PL22 SITE DRAINAGE LETTER
- PL23 SURFACE WATER RUN-OFF
- PL21 FLOOD RISK ASSESSMENT
- PL19 NOISE IMPACT ASSESSMENT
- PL18 TOPOGRAPHICAL SURVEY
- PL15 BGS FLOOD DATA
- PL16 CEH FLOOD DATA MAP
- PL14 FLOOD SCREENING REPORT DATASHEET
- PL17 INDEX MAP
- PL07 EXISTING AND PROPOSED ELEVATIONS 2
- PL06 EXISTING AND PROPOSED ELEVATIONS 1
- PL03 LOCATION PLAN 1 TO 1250
- PL11 PROPOSED FIRST FLOOR PLAN
- PL05 EXISTING GROUND AND FIRST-FLOOR PLANS
- PL08 EXISTING DRAINAGE PLAN
- PL09 PROPOSED BLOCK PLAN
- PL04 EXISTING BLOCK PLAN
- PL02 LOCATION PLAN
- PL01 APPLICATION
- PL12 PRELIMINARY ECOLOGICAL APPRAISAL
- PL13 SUPPORTING STATEMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with East Dunbartonshire for determination, against a statutory target of eight weeks. Over the last year East Dunbartonshire decided full applications in a median of 67 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In East Dunbartonshire
-
TP/ED/26/0265 Refused
46 Main Street Torrance East Dunbartonshire G64 4EL
Proposed sub-division of plot and erection of 1no dwelling including changes to driveway.
-
TP/ED/26/0190 Granted
24 Moss Road Lenzie East Dunbartonshire G66 4JB
Proposed front porch and creation of new vehicular access on to Moss Road
-
TP/ED/25/0689 Granted
Flat 2 Robinsfield House Balmore Road Balmore East Dunbartonshire G62 6ER
Proposed internal and external alterations to private dwelling.
-
TP/ED/26/0193 Granted
25 Dirleton Gate Bearsden East Dunbartonshire G61 1NP
Single storey side extension and raised decking to rear
-
TP/ED/26/0133 Granted
9 Balmuildy Road Bishopbriggs East Dunbartonshire G64 3BS
Single storey rear and side extension to include raised patio to rear. Replacement roof including new dormer window. Detached garage. Recladding of elevations. Driveway enlargement, including new secondary entrance.