Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Balmoral Drive Bearsden East Dunbartonshire G61 1DH

Granted East Dunbartonshire TP/ED/25/0461 Full planning permission

Works: Extension Loft or dormer Roofing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension, alteration and enlargement of existing front dormer, installation of rear dormer, raised decking area, and replacement roof tiles.

As published by the council, reference TP/ED/25/0461

Application record

Reference
TP/ED/25/0461
Type
Full planning permission
Status
Decided
Decision
Grant subject to condition(s)
Received
20 Aug 2025
Validated
1 Sep 2025
Decided
13 Nov 2025
Ward
Bearsden South
Parish
Bearsden East Community Council
Decision by
Delegated Decision
Postcode
G61 1DH

Timeline

Dates from the published record

  1. 20 Aug 2025

    Received by East Dunbartonshire

  2. 1 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 13 Nov 2025

    Decision issued: Grant subject to condition(s)

  4. 28 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Stewart Drawing Services Agent

49 applications on PlanIndex · across 7 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

  • REPORT OF HANDLING 19 Final Report · 14 Nov 2025
  • DECISION NOTICE 7 Decision · 13 Nov 2025
  • PL11 PROPOSED FLOOR PLANS 14 Plan · 14 Oct 2025
  • PL10 EXISTING AND PROPOSED ELEVATIONS 14 Plan · 14 Oct 2025
  • PL07 EXISTING AND PROPOSED ROOF PLANS 14 Plan · 01 Sep 2025
  • PL03 - EXISTING FLOOR PLANS 14 Plan · 20 Aug 2025
  • PL06 - EXTENSION SECTIONS AND DETAILS 14 Plan · 20 Aug 2025
  • PL01 - APPLICATION 1 Application · 20 Aug 2025
  • PL02 - LOCATION AND BLOCK PLANS 14 Plan · 20 Aug 2025

Trade members open them from here.

Open the documents

What this grant of permission means

East Dunbartonshire granted permission on 13 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In East Dunbartonshire

  • TP/ED/26/0265 Refused

    46 Main Street Torrance East Dunbartonshire G64 4EL

    Proposed sub-division of plot and erection of 1no dwelling including changes to driveway.

    14 May 2026 Full applications
  • TP/ED/26/0190 Granted

    24 Moss Road Lenzie East Dunbartonshire G66 4JB

    Proposed front porch and creation of new vehicular access on to Moss Road

    3 Apr 2026 Full applications
  • TP/ED/25/0689 Granted

    Flat 2 Robinsfield House Balmore Road Balmore East Dunbartonshire G62 6ER

    Proposed internal and external alterations to private dwelling.

    19 Dec 2025 Full applications
  • TP/ED/26/0193 Granted

    25 Dirleton Gate Bearsden East Dunbartonshire G61 1NP

    Single storey side extension and raised decking to rear

    6 Apr 2026 Full applications
  • TP/ED/26/0133 Granted

    9 Balmuildy Road Bishopbriggs East Dunbartonshire G64 3BS

    Single storey rear and side extension to include raised patio to rear. Replacement roof including new dormer window. Detached garage. Recladding of elevations. Driveway enlargement, including new secondary entrance.

    16 Mar 2026 Full applications