Skip to content
PlanIndex Get alerts
Menu

Planning application

22 Braeside Avenue Milngavie East Dunbartonshire G62 6LH

Granted East Dunbartonshire TP/ED/21/0516 Full planning permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Two storey side and rear extension

As published by the council, reference TP/ED/21/0516

Application record

Reference
TP/ED/21/0516
Type
Full planning permission
Status
Decided
Decision
Granted As published: Grant without Conditions
Received
25 May 2021
Validated
25 May 2021
Decided
9 Sep 2021
Ward
Milngavie
Parish
Milngavie Community Council
Decision by
Delegated Decision
Postcode
G62 6LH

Timeline

Dates from the published record

  1. 25 May 2021

    Received by East Dunbartonshire

  2. 9 Sep 2021

    Decision issued: Grant without Conditions

  3. 15 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Scottishbuildingwarrant: ED/BS/21/0986/BSW (Approve)

Who's behind it

Company information only, from the register and Companies House

Studio two five Agent

35 applications on PlanIndex · across 7 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

  • REPORT OF HANDLING 19 Final Report · 13 Sep 2021
  • DECISION NOTICE 7 Decision · 09 Sep 2021
  • PL10 PROPOSED GROUND FLOOR PLAN 14 Plan · 17 Aug 2021
  • PL11 PROPOSED FIRST FLOOR PLAN 14 Plan · 17 Aug 2021
  • PL12 PROPOSED ELEVATIONS 14 Plan · 17 Aug 2021
  • PL9 LOCATION AND BLOCK PLANS 14 Plan · 17 Aug 2021
  • PL1 APPLICATION 1 Application · 25 May 2021
  • PL3 EXISTING GROUND FLOOR PLAN 14 Plan · 25 May 2021
  • PL4 EXISTING UPPER FLOOR PLAN 14 Plan · 25 May 2021
  • PL5 EXISTING ELEVATIONS 14 Plan · 25 May 2021

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

East Dunbartonshire granted permission on 9 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In East Dunbartonshire

  • TP/ED/26/0265 Refused

    46 Main Street Torrance East Dunbartonshire G64 4EL

    Proposed sub-division of plot and erection of 1no dwelling including changes to driveway.

    Received 14 May, published by the council 28 Jul 2026 Full applications
  • TP/ED/26/0190 Granted

    24 Moss Road Lenzie East Dunbartonshire G66 4JB

    Proposed front porch and creation of new vehicular access on to Moss Road

    Received 3 Apr, published by the council 28 Jul 2026 Full applications
  • TP/ED/25/0689 Granted

    Flat 2 Robinsfield House Balmore Road Balmore East Dunbartonshire G62 6ER

    Proposed internal and external alterations to private dwelling.

    Received 19 Dec, published by the council 28 Jul 2026 Full applications
  • TP/ED/26/0193 Granted

    25 Dirleton Gate Bearsden East Dunbartonshire G61 1NP

    Single storey side extension and raised decking to rear

    Received 6 Apr, published by the council 28 Jul 2026 Full applications
  • TP/ED/26/0133 Granted

    9 Balmuildy Road Bishopbriggs East Dunbartonshire G64 3BS

    Single storey rear and side extension to include raised patio to rear. Replacement roof including new dormer window. Detached garage. Recladding of elevations. Driveway enlargement, including new secondary entrance.

    Received 16 Mar, published by the council 28 Jul 2026 Full applications