Planning application
35 Witheby Sidmouth EX10 8SR
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of single storey extension, carport and section of hedge removal
As published by the council, reference 26/1629/FUL
Application record
- Reference
- 26/1629/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 17 Aug 2026
- Validated
- 17 Aug 2026
- Ward
- Sidmouth Town
- Parish
- Sidmouth
- Postcode
- EX10 8SR
Comment by 11 September 2026
The council is taking comments on this application until then. Have your say on East Devon's portal.
Timeline
Dates from the published record
-
17 Aug 2026
Received by East Devon
-
23 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Devon took a median of 42 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Ottery St. Mary
50 applications on PlanIndex · across 3 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
29 Witheby Sidmouth Devon EX10 8SR
93% historically approved · decision due ~6 Apr
T1: Monterey Cypress - crown clean to remove any dead branches overhanging the road and remove any dieback from the main crown.
Awaiting decision Trees 8 docs -
Runnymede Orchard Close Manor Road Sidmouth EX10 8RS
Replace cracked tarmac and original hardstanding area with new tarmac surface with small block paving areas to break up the drive, and small extension of tarmac area
Withdrawn Full applications Extension 6 docs -
Littleton Cotmaton Road Sidmouth EX10 8SW
T1, Lime : reduce primary northern limb, arising at 3.5m on main stem, by 3m, maximum diameter of cut 75mm; remove hazardous deadwood
Granted Trees 6 docs -
Lantern Lodge Cotmaton Road Sidmouth EX10 8ST
Extension of existing balcony to provide larger balcony. Removal of existing rear steps to be replaced with new. Construction of new Boot Room. Enlargement of one window.
Granted Full applications Extension Windows or glazing 13 docs -
Lantern Lodge Cotmaton Road Sidmouth Devon EX10 8ST
NMA to 25/2336/FUL for the enlargement of the rear window facing the terrace to provide a corner window.
Withdrawn Amendments Windows or glazing 4 docs -
Bay Trees Cotmaton Road Sidmouth EX10 8ST
5 day notice: Maple: Removal (Dead). Exception to: 18/0103/TPO. Replacement planting: Acer sp.
Withdrawn Trees 1 doc
Other full applications applications
In East Devon
-
26/1714/FUL Awaiting decision
5 Long Copp Budleigh Salterton Devon EX9 6DY
Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit
-
26/1565/FUL Granted
1 Hillymead Seaton EX12 2LF
Retrospective permission for re-landscaping the drive area
-
26/1757/FUL Awaiting decision
Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL
New porch
-
26/1571/FUL Granted
Hillsboro 44 Marlpit Lane Seaton EX12 2HL
Construction of two-storey side extension
-
26/1536/FUL Granted
Bramblings Smallridge Axminster EX13 7JL
Single storey extension to the east elevation and raised patio.