Skip to content
PlanIndex Get alerts
Menu

Planning application

Bramblings Smallridge Axminster EX13 7JL

Granted East Devon 26/1536/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey extension to the east elevation and raised patio.

As published by the council, reference 26/1536/FUL

Application record

Reference
26/1536/FUL
Type
Full Application
Status
Approved
Decision
Approval with conditions
Received
4 Aug 2026
Validated
4 Aug 2026
Decided
3 Sep 2026
Ward
Yarty
Parish
All Saints
Decision by
Delegated Decision
Postcode
EX13 7JL

Timeline

Dates from the published record

  1. 4 Aug 2026

    Received by East Devon

  2. 12 Aug 2026

    Added to PlanIndex

  3. 3 Sep 2026

    Decision issued: Approval with conditions

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Yeovil

27 applications on PlanIndex · across 3 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Kaikoura Smallridge Axminster EX13 7LY

    26/0329/FUL Submitted 4 Mar 2026 304m away

    Retrospective application for wooden potting shed 8ft by 6ft

    Granted Full applications 7 docs
    Small domestic
  • Laburnum Cottage Smallridge Axminster EX13 7LY

    20/2373/LBC Submitted 2 Dec 2020 341m away

    Replace existing front door and door frame on south west elevation

    Granted Heritage and listed buildings 11 docs
  • Land Opposite Ridgeway Inn Smallridge

    25/2454/OUT Submitted 5 Dec 2025 449m away

    91% historically approved · decision due ~30 Jan

    Outline planning permission for five dwellings, all matters reserved apart from access

    Awaiting decision Outline 38 docs
    Several homes

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/0854/FUL Granted

    1 School Cottage Clyst Honiton Exeter EX5 2LZ

    Construction of detached residential dwelling.

    20 May 2026 Full applications