Skip to content
PlanIndex Get alerts
Menu

Planning application

26/1165/FUL

Eastons Dalwood EX13 7EN

Awaiting decision East Devon Full Application

Proposal

Raise the central chimney stack and the south east chimney stack; replace back door on the west elevation; remove existing greenhouse and construct new re-sited greenhouse in the garden; relocate the oil tank to the south and install ASHP to the west elevation

As published by the council, reference 26/1165/FUL

Timeline

Dates from the published record

  1. 12 Jun 2026

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/1166/LBC Awaiting decision

    Eastons Dalwood EX13 7EN

    Raise the central chimney stack and the south east chimney stack with 700mm traditional clay pots and courses of matching brickwork to achieve 1800mm height above the thatch; line the flues of these chimneys and fit new woodburners to replace existing; relocate the oil tank to the south; fit ASHP beneath the west elevation kitchen window and upgrade the existing wet radiator heating system; replace door on west elevation with a traditionally detailed, ledge door, to be painted and fitted with an upper glazed panel; provide a shower room with WC in the modern utility room, including provision of insulation in the roof and a humidistat extraction ventilator in the modern utility room window; remove existing greenhouse and replace with re-sited greenhouse

    12 Jun 2026 0m away Heritage and listed buildings

In East Devon

  • 26/0768/FUL Granted

    2 Yew Tree Cottage New Road Beer Seaton EX12 3JR

    Replacement of doors and windows and demolition of existing single storey garage

    24 Apr 2026 Full applications
  • 26/1490/FUL Awaiting decision

    7 Broad Street Ottery St Mary EX11 1BS

    Renovation works and new rear external staircase to commercial property

    28 Jul 2026 Full applications
  • 26/1486/FUL Awaiting decision

    Holly Batch Cooks Lane Axminster EX13 5SQ

    New single storey garden room extension to rear elevation.

    27 Jul 2026 Full applications
  • 26/1363/FUL Awaiting decision

    Lower Cobden Whimple Exeter EX5 2PZ

    Full planning permission for the change of use of Barn 5 from agricultural uses to storage and distribution (Use Class B8) (Retrospective)

    23 Jul 2026 Full applications
  • 26/1505/FUL Awaiting decision

    1 Whinfield Terrace Barline Beer EX12 3LN

    Erection of replacement garage/outbuilding

    23 Jul 2026 Full applications