Skip to content
PlanIndex Get alerts
Menu

Planning application

26/0991/FUL

Faraway House Farway Colyton EX24 6ED

Awaiting decision East Devon Full Application

Proposal

Replace existing timber-framed and polycarbonate-roofed veranda with new aluminium & steel-framed, glass-roofed veranda on the South Elevation.

As published by the council, reference 26/0991/FUL

Timeline

Dates from the published record

  1. 12 Jun 2026

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/0638/PRETDD Withdrawn

    Netherton Barton Farway Colyton EX24 6EB

    Five day notice: Removal of blighted Sycamore Exception to 77/0002/TP, Replacement planting: x2 Oak within property curtilage

    31 Mar 2026 90m away Trees
  • 26/0052/PRETDD Withdrawn

    The Pavilion Farway Colyton EX24 6EB

    5 day notice: Sycamore: removal of windblow

    13 Jan 2026 273m away Trees
  • 26/1199/TRE Awaiting decision

    Netherton Lodge Farway Colyton EX24 6EF

    T1, Beech : reduce back to main branch collar, crossing mid canopy branches making pruning cuts of 100mm diameter. T2, English Oak : crown lift up to 5m above ground level removing back to main collar, 3 lowest branches making 3 natural target cuts of 25mm-80mm. Particular attention to dead branches overhanging Poltimore Road. T3, Turkey Oak : crown lift up to 5m above ground level removing back to main collar, 3 lowest branches making 3 natural target cuts of 25mm - 80mm. T4, English Oak : crown lift up to 5m above ground level removing back to main collar, 3 lowest branches making 3 natural target cuts of 25mm - 80mm. Particular attention made to dead and windblown branches overhanging Grade 2 listed bridge.

    15 Jun 2026 443m away Trees

In East Devon

  • 26/0768/FUL Granted

    2 Yew Tree Cottage New Road Beer Seaton EX12 3JR

    Replacement of doors and windows and demolition of existing single storey garage

    24 Apr 2026 Full applications
  • 26/1490/FUL Awaiting decision

    7 Broad Street Ottery St Mary EX11 1BS

    Renovation works and new rear external staircase to commercial property

    28 Jul 2026 Full applications
  • 26/1486/FUL Awaiting decision

    Holly Batch Cooks Lane Axminster EX13 5SQ

    New single storey garden room extension to rear elevation.

    27 Jul 2026 Full applications
  • 26/1363/FUL Awaiting decision

    Lower Cobden Whimple Exeter EX5 2PZ

    Full planning permission for the change of use of Barn 5 from agricultural uses to storage and distribution (Use Class B8) (Retrospective)

    23 Jul 2026 Full applications
  • 26/1505/FUL Awaiting decision

    1 Whinfield Terrace Barline Beer EX12 3LN

    Erection of replacement garage/outbuilding

    23 Jul 2026 Full applications