Skip to content
PlanIndex Get alerts
Menu

Planning application

Jackmoor Cottage Upton Pyne Exeter EX5 5HY

Granted East Devon 26/0826/LBC Listed Building Consent

Works: Extension Demolition Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolish single story extension on N/E elevation, construction of single storey extension on N/E elevation; replacement windows and external doors throughout and 2no. new windows on N/E elevation

As published by the council, reference 26/0826/LBC

Application record

Reference
26/0826/LBC
Type
Listed Building Consent
Status
Approved
Decision
Approval with conditions
Received
15 Jun 2026
Validated
15 Jun 2026
Decided
19 Aug 2026
Ward
Exe Valley
Parish
Upton Pyne
Decision by
Delegated Decision
Postcode
EX5 5HY

Site history

Applications at this address on the East Devon register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • 26/0825/FUL Granted

    Jackmoor Cottage Upton Pyne Exeter EX5 5HY

    Demolish single story extension on N/E elevation, construction of single storey extension on N/E elevation; replacement windows and external doors throughout and 2no. new windows on N/E elevation

    Decided 19 Aug 2026 Full applications

Timeline

Dates from the published record

  1. 15 Jun 2026

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. 19 Aug 2026

    Decision issued: Approval with conditions

Who's behind it

Company information only, from the register and Companies House

New British Design Agent, a design practice

12 applications on PlanIndex · across 7 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

East Devon granted permission on 19 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In East Devon

  • 26/0890/LBC Withdrawn

    62 Camperdown Terrace Exmouth EX8 1EQ

    Installation of a single electric vehicle charge point

    9 Jun 2026 Heritage and listed buildings
  • 26/0878/LBC Granted

    3 Primley House Sidford Road Sidmouth EX10 9LN

    Replacement of 8no windows and 2no external doors, and repair works to sections of external and boundary walls.

    2 Jun 2026 Heritage and listed buildings
  • 26/1825/LBC Awaiting decision

    Newlands Dalwood Axminster EX13 7HQ

    Raising of existing chimney to 1.8 metres above ridge to comply with Hetas Regulations

    8 Sep 2026 Heritage and listed buildings
  • 26/1659/LBC Awaiting decision

    1 & 2 School Cottages Woodbury Salterton Exeter EX5 1PG

    Remove and replace first three rows of roof tiles at the rear of the property for the full width of cottages no. 1 and no. 2 from guttering upwards; tiles are manufactured and suitable replacements will be sought and selected to ensure the continuity is kept

    4 Sep 2026 Heritage and listed buildings
  • 26/1719/LBC Awaiting decision

    Flat 7 18 The Beacon Exmouth EX8 2AF

    Replace existing balcony railings at second floor front (south west) elevation

    3 Sep 2026 Heritage and listed buildings