Skip to content
PlanIndex Get alerts
Menu

Planning application

Fudge Cottage Dalditch Lane Budleigh Salterton EX9 7AH

Granted East Devon 26/0180/LBC Listed Building Consent

Works: Extension Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replace conservatory with sun room on rear west elevation; removal of walls and doors in hallway & creation of new WC; removal of small section of original wall leading from hall into new sunroom to accommodate new double doors; add rainwater goods on front elevation; addition of roof lantern on flat roof; addition of rooflights in west elevation & reduce ground level in rear garden

As published by the council, reference 26/0180/LBC

Application record

Reference
26/0180/LBC
Type
Listed Building Consent
Status
Approved
Decision
Granted As published: Approval with conditions
Received
25 Feb 2026
Validated
25 Feb 2026
Decided
15 May 2026
Ward
Budleigh And Raleigh
Parish
Budleigh Salterton
Decision by
Delegated Decision
Postcode
EX9 7AH

Timeline

Dates from the published record

  1. 25 Feb 2026

    Received by East Devon

  2. 15 May 2026

    Decision issued: Approval with conditions

  3. 26 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Sidmouth Design Agent, a design practice

7 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

East Devon granted permission on 15 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In East Devon

  • 26/1829/LBC Awaiting decision

    4 Porch Cottages Church Street Sidford Sidmouth EX10 9RG

    Reduce height to chimney and cap-off the whole of the chimney

    Received 30 Sep, published by the council 6 Oct 2026 Heritage and listed buildings
  • 26/1935/LBC Awaiting decision

    4 Causeway Cottages Causeway Beer Seaton EX12 3LF

    Proposed single storey rear extension

    Received 29 Sep, published by the council 6 Oct 2026 Heritage and listed buildings
  • 26/1764/LBC Awaiting decision

    12 Beer Road Seaton EX12 2PA

    Replace glazed window pane only on 1no. dormer window on south elevation (W5)

    Received 28 Sep, published by the council 6 Oct 2026 Heritage and listed buildings
  • 26/1776/LBC Awaiting decision

    Stanley Cottage Whitford Axminster EX13 7PE

    Replace ceilings in sitting room and upstairs hallway with lath and plaster (like-for-like) after flood damage.

    Received 28 Sep, published by the council 6 Oct 2026 Heritage and listed buildings
  • 26/1711/LBC Awaiting decision

    Oak Cottage Snodwell Farm Post Lane Cotleigh Devon EX14 9HZ

    Various works to main house and annexe: remove lean-to extension; reinstate ceilings; underfloor heating, DPM & insulation; replace staircase & internal doors; removal & construction of new walls; new steel beam installed for roof strengthening; roof living room: replace roof, remove A-frame & trusses & reinstate historic A-frame; new insulation, timbers & steel frame; roof dining room & others: replace roof and timbers. Annexe: ceilings removed & reinstated, new steel beams installed; new party wall; floors DPM & insulation; replace internal doors with fire doors; staircase to have new balustrade & handrail; removal of wall; timber landing extended; construction of new wall; remove Upvc roof & replace with rooflight; archway blocked up with door; replacement floors. External works: all windows replaced; Rear elevation: window & door removed & central window added, rooflight replaced on first floor, window & door removed & central window added; replace fascias & guttering. 2no. bifold doors on south elevation; dormer window increased in size with Juliette balcony, ASHP, removal of chimney; exchange double door & window, 3no. rooflights, window & door removed & new window created on west elevation; hipped roof to gable on south; Bat and bird boxes

    Received 23 Sep, published by the council 6 Oct 2026 Heritage and listed buildings