Skip to content
PlanIndex Get alerts
Menu

Planning application

8 Hayne Park Tipton St John Devon EX10 0TA

Granted East Devon 25/2402/FUL Full Application

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing and construction of replacement single storey rear extension

As published by the council, reference 25/2402/FUL

Application record

Reference
25/2402/FUL
Type
Full Application
Status
Approved
Decision
Approval with conditions
Received
26 Nov 2025
Validated
26 Nov 2025
Decided
21 Jan 2026
Ward
Ottery St Mary
Parish
Ottery St Mary
Decision by
Delegated Decision
Postcode
EX10 0TA

Timeline

Dates from the published record

  1. 26 Nov 2025

    Received by East Devon

  2. 21 Jan 2026

    Decision issued: Approval with conditions

  3. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 5 Hayne Park Tipton St John Sidmouth EX10 0TA

    26/1007/FUL Submitted 22 May 2026 77m away

    Two storey side extension

    Granted Full applications Extension 10 docs
  • St Marys Hayne Close Tipton St John EX10 0BA

    26/0196/FUL Submitted 3 Feb 2026 188m away

    Removal of chimney stack, addition of roof window, raising roof <100mm to allow addition of insulation, remodelling 2no. windows with addition of 'Juliet' balcony.

    Granted Full applications Windows or glazing 19 docs
  • 1 Tipton Lodge Tipton St John Sidmouth EX10 0AW

    25/2064/PRETDD Submitted 7 Oct 2025 253m away

    5 day notice: Monterey Pine: removal of dead, split and failed branches. Replanting: No replacement.

    Withdrawn Trees 1 doc
  • 1 Tipton Lodge Tipton St John Sidmouth EX10 0AW

    21/0086/TRE Submitted 13 Jan 2021 278m away

    Monterey Pine - Remove one limb growing towards roof of neighbours house (Willow Cottage) Reason: To reduce risk of damage to property.

    Granted Trees 3 docs
  • St Johns Church Tipton St John

    25/2091/TRE Submitted 23 Oct 2025 458m away

    Oak: reduction of lower southern aspect branches by 4-5m and a reduction of lower eastern branches by 2-3m. At a height of up to 12m, on the eastern aspect, prune back by 2-3m leaving clearane from the church roof line.

    Split decision Trees 5 docs

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/1536/FUL Granted

    Bramblings Smallridge Axminster EX13 7JL

    Single storey extension to the east elevation and raised patio.

    4 Aug 2026 Full applications