Skip to content
PlanIndex Get alerts
Menu

Planning application

Jasmine Cottage The Strand Lympstone Exmouth EX8 5JR

Granted East Devon 25/2039/LBC Listed Building Consent

Works: Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replace existing passageway roof and install 3no. rooflights; construct wall at end of passageway and insert 1no. window on north elevation; removal of partition walls in utility and construct new partition wall and door opening to create wet room; create level floor across the passageway; install double doors in existing opening between dining and lounge to create bedroom

As published by the council, reference 25/2039/LBC

Application record

Reference
25/2039/LBC
Type
Listed Building Consent
Status
Approved
Decision
Approval with conditions
Received
3 Oct 2025
Validated
3 Oct 2025
Decided
17 Dec 2025
Ward
Woodbury And Lympstone
Parish
Lympstone
Decision by
Committee Decision
Postcode
EX8 5JR

Timeline

Dates from the published record

  1. 3 Oct 2025

    Received by East Devon

  2. 17 Dec 2025

    Decision issued: Approval with conditions

  3. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

East Devon granted permission on 17 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Corner House Burgmanns Hill Lympstone Exmouth EX8 5HN

    26/1292/LBC Submitted 29 Jun 2026 63m away

    94% historically approved · decision due ~24 Aug

    Demolition of single storey extension and replacement with new single storey extension and internal alterations.

    Awaiting decision Heritage and listed buildings Extension Demolition 16 docs
    Small domestic
  • Corner House Burgmanns Hill Lympstone Exmouth EX8 5HN

    26/1291/FUL Submitted 29 Jun 2026 63m away

    93% historically approved · decision due ~24 Aug

    Demolition of single storey extension and replacement with new single storey extension and internal alterations.

    Awaiting decision Full applications Extension Demolition 17 docs
    Small domestic
  • Hope Cottage The Strand Lympstone Devon EX8 5JS

    25/2489/NMA Submitted 3 Dec 2025 79m away

    96% historically approved · decision due ~28 Jan

    Non-Material Minor Amendment to 25/1300/FUL: amendment to Ecological Impact Assessment and Environmental Action Plan to allow variation of working hours

    Awaiting decision Amendments 5 docs
  • Hope Cottage The Strand Lympstone Devon EX8 5JS

    25/2530/DOC Submitted 9 Dec 2025 81m away

    95% historically approved · decision due ~3 Feb

    Discharge of Condition for 25/1300/FUL: Conditon 3 (CEMP), Condition 4 (Trees) 4. We are submitting an updated Arboricultural Method Statement (AMS) and Tree Protection Plan (TPP) to reflect the revised bridge design, the full details of the ground protection measures in respect of the temporary access track, and the replacement planting details including species and establishment of trees within the private garden areas of the scheme, and the other site-specific details. We are also submitting an updated Landscape Reinstatement Plan, a Tree Replanting Letter, the Homeowner Notice of Entry Letters and the Candy?s Field Tree Planting Maintenance Plan which have been informally reviewed and accepted by Stuart Baker prior to this application. BNG. We are submitting a BNG Plan, a BNG Metric and a BNG Statement. This should be everything that is needed to enable the start of the works.

    Awaiting decision Conditions 13 docs
  • Hope Cottage The Strand Lympstone Exmouth EX8 5JS

    25/2535/DBG Submitted 9 Dec 2025 81m away

    95% historically approved · decision due ~3 Feb

    Discharge of Biodiversity Gain Plan for 25/1300/FUL

    Awaiting decision Conditions 4 docs
  • Hope Cottage The Strand Lympstone Devon EX8 5JS

    26/0727/DOC Submitted 13 Apr 2026 81m away

    Discharge of conditions for 25/1301/LBC : Condition 3 (cladding)

    Granted Conditions 4 docs

In East Devon

  • 26/0796/LBC Granted

    1 Fairview Globe Hill Woodbury Exeter EX5 1JR

    Construction of a first-floor rear extension and alterations to the rear roof slope, including replacement of the rear roof covering. Internal refurbishment works including replacement of floor structures including some height differences, plaster, joinery, installation of new heating and plumbing systems and floor layout changes. External repairs including changes to fenestration, repairs to windows, replacement of cement render and rainwater goods.

    12 May 2026 Heritage and listed buildings
  • 26/1399/LBC Granted

    Northampton Cottage Cotleigh Honiton EX14 9HR

    Replacement of existing slate roof covering

    14 Jul 2026 Heritage and listed buildings
  • 26/0757/LBC Granted

    Clyston Mill Broadclyst

    Replace existing slate roof covering to Clyston Mill

    23 Apr 2026 Heritage and listed buildings
  • 26/1615/LBC Awaiting decision

    11 Sid Lane Sidmouth Devon EX10 9AN

    Replace 1no. window at ground floor and 1no. window at first floor on front (south) elevation; replace 1no. door on rear (north) elevation with stable door and patch render repair on front, rear & side (north, south & east) elevation

    20 Aug 2026 Heritage and listed buildings
  • 26/0826/LBC Granted

    Jackmoor Cottage Upton Pyne Exeter EX5 5HY

    Demolish single story extension on N/E elevation, construction of single storey extension on N/E elevation; replacement windows and external doors throughout and 2no. new windows on N/E elevation

    15 Jun 2026 Heritage and listed buildings