Skip to content
PlanIndex Get alerts
Menu

Planning application

17 Lea Combe Axminster EX13 5LJ

Granted East Devon 25/2034/FUL Full Application

Works: Extension Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed side extension and bay window

As published by the council, reference 25/2034/FUL

Application record

Reference
25/2034/FUL
Type
Full Application
Status
Approved
Decision
Approval with conditions
Received
2 Oct 2025
Validated
2 Oct 2025
Decided
27 Nov 2025
Ward
Axminster
Parish
Axminster
Decision by
Delegated Decision
Postcode
EX13 5LJ

Timeline

Dates from the published record

  1. 2 Oct 2025

    Received by East Devon

  2. 27 Nov 2025

    Decision issued: Approval with conditions

  3. 12 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

27 applications on PlanIndex · across 3 councils · 86% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • The Elms Lyme Road Axminster Devon EX13 5AZ

    25/1712/TRE Submitted 24 Aug 2025 242m away

    Copper Beech - removal of lower hanging branches within The Elms, and neighbouring property at 33 Fosseway Close, to a maximum length of 3.5m. Reduction of branches overhanging 33 Fosseway Close, at approximately 3-4m above ground level, to create a compact crown (as per annotated photograph).

    Granted Trees 6 docs
  • 1 Morton Way Boxfield Road Axminster EX13 5LE

    25/2008/DOC Submitted 29 Sep 2025 251m away

    Discharge of Condition for 25/1452/FUL: Condition 3 (Surface water drainage)

    Decided Conditions 5 docs
  • Land North Of 4 Lyme Close Axminster

    25/2105/PRETDD Submitted 14 Oct 2025 272m away

    Five day notice : T1: Oak; T2: Silver Birch - removal with replanting

    Withdrawn Trees 2 docs
  • The Rectory Church Street Axminster Devon EX13 5AQ

    25/2281/TCA Submitted 6 Nov 2025 276m away

    T1, Magnolia: remove close to ground level and treat stumps with herbicide to inhibit growth due to subsidence. SG3, Laurel : crown reduction.

    Decided Trees 5 docs
  • 2 Banffshire House South Street Axminster EX13 5AD

    26/0444/R77 Submitted 5 Mar 2026 287m away

    Change of use from commercial, business and service (use class E) to residential (use class C3) - Application under Regulation 77 of the Conservation of Habitats and Species Regulations 2017.

    Refused Heritage and listed buildings 10 docs
  • 2 Banffshire House South Street Axminster EX13 5AD

    26/0550/FUL Submitted 25 Mar 2026 287m away

    Retrospective application to block up a small window and replace 2 x windows and 1 x door with UPVC to the west (rear) elevation

    Granted Full applications Windows or glazing 10 docs

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/1536/FUL Granted

    Bramblings Smallridge Axminster EX13 7JL

    Single storey extension to the east elevation and raised patio.

    4 Aug 2026 Full applications