Planning application
The Mill 17 Rewe Barton Rewe Exeter EX5 4EH
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of electric vehicle charging point on pedestal within the curtilage of the dwelling and adjacent to parking spaces
As published by the council, reference 25/2024/LBC
Application record
- Reference
- 25/2024/LBC
- Type
- Listed Building Consent
- Status
- Approved
- Decision
- Granted As published: Approval with conditions
- Received
- 29 Sep 2025
- Validated
- 29 Sep 2025
- Decided
- 7 Nov 2025
- Ward
- Exe Valley
- Parish
- Rewe
- Decision by
- Delegated Decision
- Postcode
- EX5 4EH
Timeline
Dates from the published record
-
29 Sep 2025
Received by East Devon
-
7 Nov 2025
Decision issued: Approval with conditions
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
East Devon granted permission on 7 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Mill 17 Rewe Barton Rewe Devon EX5 4EH
Installation of electric vehicle charging point on pedestal within the curtilage of the dwelling and adjacent to parking spaces.
Granted Full applications 9 docsDomestic -
5 Rewe Barton Farm Cottages Rewe Exeter EX5 4EU
Single storey rear extension.
Granted Full applications Extension 16 docsSmall domestic -
5 Rewe Barton Farm Cottages Rewe Exeter EX5 4EU
93% historically approved · decision due ~25 Mar
Rear extension into the courtyard to improve the kitchen's spatial layout, create a snug, and incorporate a WC/utility within the existing outbuilding
Awaiting decision Full applications Extension 11 docs -
West Ridge Rewe Exeter EX5 4EU
Certificate of Proposed Lawful development for the construction of a new gym, sauna and store.
Granted Lawful development -
West Ridge Rewe Devon EX5 4EU
Certificate of Proposed Lawful Development for the construction of a new detached garage, adjoining workshop and extension of drive to garage.
Granted Lawful development Extension 5 docs -
The Bungalow Rewe Exeter EX5 4EU
Replacement roof with rooms within and associated works.
Granted Full applications Roofing 17 docs
Other heritage and listed building applications
In East Devon
-
26/1829/LBC Awaiting decision
4 Porch Cottages Church Street Sidford Sidmouth EX10 9RG
Reduce height to chimney and cap-off the whole of the chimney
-
26/1935/LBC Awaiting decision
4 Causeway Cottages Causeway Beer Seaton EX12 3LF
Proposed single storey rear extension
-
26/1764/LBC Awaiting decision
12 Beer Road Seaton EX12 2PA
Replace glazed window pane only on 1no. dormer window on south elevation (W5)
-
26/1776/LBC Awaiting decision
Stanley Cottage Whitford Axminster EX13 7PE
Replace ceilings in sitting room and upstairs hallway with lath and plaster (like-for-like) after flood damage.
-
26/1711/LBC Awaiting decision
Oak Cottage Snodwell Farm Post Lane Cotleigh Devon EX14 9HZ
Various works to main house and annexe: remove lean-to extension; reinstate ceilings; underfloor heating, DPM & insulation; replace staircase & internal doors; removal & construction of new walls; new steel beam installed for roof strengthening; roof living room: replace roof, remove A-frame & trusses & reinstate historic A-frame; new insulation, timbers & steel frame; roof dining room & others: replace roof and timbers. Annexe: ceilings removed & reinstated, new steel beams installed; new party wall; floors DPM & insulation; replace internal doors with fire doors; staircase to have new balustrade & handrail; removal of wall; timber landing extended; construction of new wall; remove Upvc roof & replace with rooflight; archway blocked up with door; replacement floors. External works: all windows replaced; Rear elevation: window & door removed & central window added, rooflight replaced on first floor, window & door removed & central window added; replace fascias & guttering. 2no. bifold doors on south elevation; dormer window increased in size with Juliette balcony, ASHP, removal of chimney; exchange double door & window, 3no. rooflights, window & door removed & new window created on west elevation; hipped roof to gable on south; Bat and bird boxes