Seaton Hole Beach The Esplanade Seaton

Granted East Devon 25/1747/DOC Discharge of Condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of Condition for 25/0968/MFUL: Condition 4 (Construction Traffic Management Plan), Condition 5 (Construction Phase Plan), Condition 6 (Site Waste Management Plan) and Condition 8 (Construction Environmental Management Plan)

As published by the council, reference 25/1747/DOC

Application record

Reference
25/1747/DOC
Type
Discharge of Condition
Status
Conditions
Decision
Granted As published: Discharge of condition
Received
22 Aug 2025
Validated
22 Aug 2025
Decided
22 Aug 2025
Ward
Beer And Branscombe
Parish
Seaton

Site history

Applications at this address on the East Devon register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 25/1731/DOC Granted

    Seaton Hole Beach The Esplanade Seaton

    Discharge of condition for 25/0968/MFUL: Condition 3 (Materials), Condition 7 (HMMP) and the statutory Biodiversity Gain Plan condition

    Decided 26 Aug 2025 Conditions

Timeline

Dates from the published record

  1. 22 Aug 2025

    Received by East Devon

  2. 22 Aug 2025

    Decision issued: Discharge of condition

  3. 12 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

BCP Council (South West Flood and Coastal) Agent

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

East Devon granted permission on 22 August 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Seaton Hole Beach The Esplanade Seaton

    25/1731/DOC Submitted 22 Aug 2025 50 yards away

    Discharge of condition for 25/0968/MFUL: Condition 3 (Materials), Condition 7 (HMMP) and the statutory Biodiversity Gain Plan condition

    Granted Conditions 8 docs
  • Whitehaven Highcliffe Close Seaton Devon EX12 2QA

    26/1473/TRE Submitted 22 Jul 2026 200 yards away

    93% historically approved · decision due ~16 Sep

    T1: Norway Maple - all over crown reduction of 1-1.5m, keeping the branches back from the driveway and property. Cut diameters approximately 50mm maximum.

    Awaiting decision Trees
  • Penhorwood Highcliffe Close Seaton EX12 2QA

    26/0919/PRETDD Submitted 11 May 2026 250 yards away

    5 day notice: Exception to 16/0017/TPO Works: Horse Chestnut: remove (dead) Replacement planting: Walnut.

    Withdrawn Trees 1 doc
  • White Stones 60 Beer Road Seaton EX12 2PR

    26/0951/FUL Submitted 3 Jun 2026 250 yards away

    Constructing rooms within the existing roof space with Dormer windows and balcony to the south elevation

    Granted Full applications Loft or dormer Windows or glazing 14 docs
  • Combecroft 85 Beer Road Seaton EX12 2PT

    26/0493/FUL Submitted 17 Mar 2026 300 yards away

    Demolish existing single storey side porch, construction of single storey side extension, extended raised patio & new balustrade.

    Granted Full applications Extension Demolition 11 docs
    Small domestic
  • 87 Beer Road Seaton Devon EX12 2PT

    26/1681/TRE Submitted 19 Aug 2026 350 yards away

    93% historically approved · decision due ~14 Oct

    T1, Horse Chestnut Stand : crown reduction of the 3/4 Horse Chestnuts within the stand. Reducing the crowns by up to 3m with diameter cuts up to 75mm. Pruning to previous crown reduction cuts. Minimal target pruning of the lower crown to shape in, with cuts of up to 2m in length at 50mm diameter.

    Awaiting decision Trees 4 docs

In East Devon

  • 26/2041/DOC Awaiting decision

    Lower Corry Farm Dalwood Axminster EX13 7HJ

    Discharge of condition for 24/1032/LBC: Condition 3 (Materials)

    Received 7 Oct, published by the council 9 Oct 2026 Conditions
  • 26/2038/DOC Awaiting decision

    Skypark Dakota Way Exeter Airport Clyst Honiton Exeter EX5 2BD

    Discharge of condition for 22/2825/MFUL: Condition 4 (CEMP), Condition 5 (Asbestos Management Survey), Condition 6 (Drainage), Condition 7 (Landscaping)

    Received 6 Oct, published by the council 9 Oct 2026 Conditions
  • 26/2042/DOC Awaiting decision

    8 Oakbeer Orchard Cranbrook Devon EX5 7BL

    Discharge of conditions for 26/0188/FUL : Condition 3 (surface water drainage)

    Received 6 Oct, published by the council 9 Oct 2026 Conditions
  • 26/2026/DOC Awaiting decision

    Plot 6 Tiger Moth Road Skypark Clyst Honiton Exeter EX5 2BD

    Discharge of conditions for 26/0479/MFUL : Condition 4 (surface water drainage) Condition 5 (soft/hard landscaping), Condition 9 (construction works), Condition 10 (Construction Management Plan), Condition 12 (CEcoMP), Condition 13 (LEMP), Condition 14 (wildlife hazard management plan) , Condition 15 (IFP Assessment), Condition 16 (waste audit statement), Condition 17 (ground conditions)

    Received 5 Oct, published by the council 9 Oct 2026 Conditions
  • 26/2017/DOC Granted

    May House Combpyne Road Musbury EX13 8AR

    Discharge of Condition for 25/2292/LBC: Condition 6

    Received 2 Oct, published by the council 9 Oct 2026 Conditions