Skip to content
PlanIndex Get alerts
Menu

Planning application

Premier Inn Esplanade Exmouth Devon EX8 2AZ

Granted East Devon 25/1691/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of balconies and removal and replacement of external render

As published by the council, reference 25/1691/FUL

Application record

Reference
25/1691/FUL
Type
Full Application
Status
Approved
Decision
Approval with conditions
Received
14 Aug 2025
Validated
14 Aug 2025
Decided
7 Oct 2025
Ward
Exmouth Town
Parish
Exmouth
Decision by
Delegated Decision
Postcode
EX8 2AZ

Timeline

Dates from the published record

  1. 14 Aug 2025

    Received by East Devon

  2. 7 Oct 2025

    Decision issued: Approval with conditions

  3. 12 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Bourne End

352 applications on PlanIndex · across 111 councils · 91% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land At The Beacon Exmouth

    25/2056/TCA Submitted 6 Oct 2025 110m away

    T1, Turkey Oak : re-pollard.

    Decided Trees 8 docs
  • The Royal Beacon The Beacon Exmouth EX8 2AF

    25/2398/LBC Submitted 11 Dec 2025 137m away

    94% historically approved · decision due ~5 Feb

    Change of use, associated demolitions and proposed conversion of grade II listed hotel, to 20no. 1,2 and 3 bed apartments with basement storage, associated parking and infrastructure; demolition of rear modern block to provide 2 newbuild semi-detached mews houses including integrated garages

    Awaiting decision Heritage and listed buildings New dwelling Demolition 33 docs
  • The Royal Beacon The Beacon Exmouth EX8 2AF

    25/2397/MFUL Submitted 11 Dec 2025 137m away

    93% historically approved · decision due ~12 Mar

    Change of use, associated demolitions and proposed conversion of grade II listed hotel, to 20no. 1,2 and 3 bed apartments with basement storage, associated parking and infrastructure; demolition of rear modern block to provide 2 newbuild semi-detached mews houses including integrated garages

    Awaiting decision Full applications New dwelling Demolition 38 docs
    Major scheme
  • 6 Rolle Villas Exmouth Devon EX8 2AE

    26/0434/TCA Submitted 3 Mar 2026 188m away

    T1, pseudo acacia : reduce by 2m back to previous cuts. T2, Walnut : carry out a one in three crown thin, not removing a branch with a greater diameter than 100mm. T3, Oak : reduce the height and spread by 2m. T4, Sycamore : reduce by 2.5m back to previous cuts.

    Decided Trees 4 docs
  • Golden Dragon 1A The Beacon Exmouth EX8 2AG

    26/1342/DOC Submitted 1 Jul 2026 207m away

    95% historically approved · decision due ~26 Aug

    Discharge of condition for 25/2220/LBC: Condition 3 (Materials), Condition 4 (Decorative Tiles)

    Awaiting decision Conditions 7 docs
  • The Golden Dragon 1A The Beacon Exmouth EX8 2AG

    25/2219/FUL Submitted 14 Nov 2025 207m away

    93% historically approved · decision due ~9 Jan

    Proposed change of use from commercial to residential, alterations to fenestration. New roofing to rear with installation of Solar panels

    Awaiting decision Full applications Windows or glazing 18 docs

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/1536/FUL Granted

    Bramblings Smallridge Axminster EX13 7JL

    Single storey extension to the east elevation and raised patio.

    4 Aug 2026 Full applications