Planning application
Mole Avon Trading Ltd Station Yard Axminster Devon EX13 5PF
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of new mesh fence along front site car park boundary including 2 sets of matching gates.
As published by the council, reference 25/1574/FUL
Application record
- Reference
- 25/1574/FUL
- Type
- Full Application
- Status
- Approved
- Decision
- Approval with conditions
- Received
- 14 Aug 2025
- Validated
- 14 Aug 2025
- Decided
- 9 Oct 2025
- Ward
- Axminster
- Parish
- Axminster
- Decision by
- Delegated Decision
- Postcode
- EX13 5PF
Timeline
Dates from the published record
-
14 Aug 2025
Received by East Devon
-
9 Oct 2025
Decision issued: Approval with conditions
-
12 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Exeter
56 applications on PlanIndex · across 6 councils · 86% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
A358/The Trafalgar Way/Shand Park Roundabout Axminster EX13 5NG
Erection of 4 no. non-illuminated sponsorship signs on the roundabout, one sign facing each road entrance
Withdrawn Advertising 7 docs -
Tesco Stores Ltd Shand Park Axminster Devon EX13 5NG
93% historically approved · decision due ~3 Dec
G5, x7 Laurel : fell. T64, Goat Willow : fell. T65, Apple : reduce and reshape crown by 1.5m. T68, Sycamore : reduce and reshape crown by 2m. T94, Ash : fell. T115, Alder : fell. T156, Silver Birch : fell. T182 and T183, Sycamore : fell. T116, Sycamore : reduce and reshapre crown by 2m. T117, Sycamore : reduce and reshape crown by 1m. T238, Ash : fell. T239, Silver Birch : fell.
Awaiting decision Trees 10 docs -
1 West Close Axminster EX13 5PE
T1 : Oak - crown lift to 4m from ground level and up to 50mm dia. with an objective to remove the lower small branches and growth back to the stem. Overall radial crown reduction, removing up to 2m in length and 50mm dia., to just below the previous crown-reduction cuts.
Granted Trees 7 docs -
Miltons Yard West Street Axminster
Change of use and conversion of 5 no. shop units to 3 no. ground floor flats.
Withdrawn Full applications New dwelling 14 docs -
1 West Street Axminster EX13 5NX
Discharge of Condition for 25/0983/FUL: Condition 4 (Litter and Waste Plan).
Granted Conditions 6 docs -
1 West Street Axminster EX13 5NX
93% historically approved · decision due ~10 Oct
Change of use from existing Class E premises (formerly operating as a coffee shop) to a hot food takeaway (Sui Generis) including installation of extraction system with external flue (retrospective application).
Awaiting decision Full applications 14 docs
Other full applications applications
In East Devon
-
26/1714/FUL Awaiting decision
5 Long Copp Budleigh Salterton Devon EX9 6DY
Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit
-
26/1565/FUL Granted
1 Hillymead Seaton EX12 2LF
Retrospective permission for re-landscaping the drive area
-
26/1757/FUL Awaiting decision
Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL
New porch
-
26/1571/FUL Granted
Hillsboro 44 Marlpit Lane Seaton EX12 2HL
Construction of two-storey side extension
-
26/1536/FUL Granted
Bramblings Smallridge Axminster EX13 7JL
Single storey extension to the east elevation and raised patio.