Skip to content
PlanIndex Get alerts
Menu

Planning application

19 Underhill Crescent Lympstone Exmouth EX8 5JF

Granted East Devon 24/1201/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey porch extension.

As published by the council, reference 24/1201/FUL

Application record

Reference
24/1201/FUL
Type
Full Application
Status
Approved
Decision
Granted As published: Approval with conditions
Received
24 Jun 2024
Validated
24 Jun 2024
Decided
19 Jul 2024
Ward
Woodbury And Lympstone
Parish
Lympstone
Decision by
Delegated Decision
Postcode
EX8 5JF

Timeline

Dates from the published record

  1. 24 Jun 2024

    Received by East Devon

  2. 19 Jul 2024

    Decision issued: Approval with conditions

  3. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

East Devon granted permission on 19 July 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 16 Underhill Crescent Lympstone Exmouth EX8 5JF

    26/0448/FUL Submitted 5 Mar 2026 100 yards away

    Single storey extension to the south elevation, new dormer windows to the north and south elevations and widening of driveway.

    Granted Full applications Extension Loft or dormer +1 19 docs
    Small domestic
  • Land Adjoining Town Dairy Church Road Lympstone

    26/1218/PRETDD Submitted 17 Jun 2026 150 yards away

    Five day notice : Alder: remove (dead).

    Withdrawn Trees 9 docs
  • Hope Cottage The Strand Lympstone Devon EX8 5JS

    25/2530/DOC Submitted 9 Dec 2025 150 yards away

    97% historically approved · decision due ~3 Feb

    Discharge of Condition for 25/1300/FUL: Conditon 3 (CEMP), Condition 4 (Trees) 4. We are submitting an updated Arboricultural Method Statement (AMS) and Tree Protection Plan (TPP) to reflect the revised bridge design, the full details of the ground protection measures in respect of the temporary access track, and the replacement planting details including species and establishment of trees within the private garden areas of the scheme, and the other site-specific details. We are also submitting an updated Landscape Reinstatement Plan, a Tree Replanting Letter, the Homeowner Notice of Entry Letters and the Candy?s Field Tree Planting Maintenance Plan which have been informally reviewed and accepted by Stuart Baker prior to this application. BNG. We are submitting a BNG Plan, a BNG Metric and a BNG Statement. This should be everything that is needed to enable the start of the works.

    Awaiting decision Conditions 13 docs
  • Hope Cottage The Strand Lympstone Exmouth EX8 5JS

    25/2535/DBG Submitted 9 Dec 2025 150 yards away

    97% historically approved · decision due ~3 Feb

    Discharge of Biodiversity Gain Plan for 25/1300/FUL

    Awaiting decision Conditions 4 docs
  • Hope Cottage The Strand Lympstone Devon EX8 5JS

    26/0727/DOC Submitted 13 Apr 2026 150 yards away

    Discharge of conditions for 25/1301/LBC : Condition 3 (cladding)

    Granted Conditions 4 docs
  • Hope Cottage The Strand Lympstone Devon EX8 5JS

    25/2489/NMA Submitted 3 Dec 2025 150 yards away

    96% historically approved · decision due ~28 Jan

    Non-Material Minor Amendment to 25/1300/FUL: amendment to Ecological Impact Assessment and Environmental Action Plan to allow variation of working hours

    Awaiting decision Amendments 5 docs

In East Devon

  • 26/2021/FUL Awaiting decision

    19 Stoneborough Lane Budleigh Salterton EX9 6HL

    Proposed single storey rear and side extensions

    Received 5 Oct, published by the council 9 Oct 2026 Full applications
  • 26/1999/FUL Awaiting decision

    Glendale Clyst St George Exeter EX3 0QJ

    Demolition of existing rear single storey extension with replacement single storey extension and formation of new internal driveway

    Received 5 Oct, published by the council 9 Oct 2026 Full applications
  • 26/1111/FUL Refused

    Flat 1 11 Marine Place Seaton EX12 2QJ

    Replacing non-functioning timber sash windows with same style white uPVC sash windows on western elevation.

    Received 9 Jun, published by the council 26 Jul 2026 Full applications
  • 26/1770/FUL Awaiting decision

    Roseleigh Church Road Colaton Raleigh Devon EX10 0LH

    Demolition of existing bungalow and construction of replacement two-storey dwelling

    Received 2 Oct, published by the council 9 Oct 2026 Full applications
  • 26/1708/FUL Granted

    Southlea Lower Broad Oak Road West Hill Ottery St Mary EX11 1XH

    Proposed rear/south extension in place of existing conservatory, new entrance door and canopy, cladding and raised patio to main dwelling; garage extension and roof alterations, including solar installation

    Received 7 Sep, published by the council 17 Sep 2026 Full applications