Planning application
12 Bridge Road Budleigh Salterton EX9 6EA
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of single storey ground floor areas, proposed two storey extension to north and west elevations.
As published by the council, reference 24/1172/FUL
Application record
- Reference
- 24/1172/FUL
- Type
- Full Application
- Status
- Approved
- Decision
- Approval with conditions
- Received
- 19 Jun 2024
- Validated
- 19 Jun 2024
- Decided
- 17 Jul 2024
- Ward
- Budleigh And Raleigh
- Parish
- Budleigh Salterton
- Decision by
- Delegated Decision
- Postcode
- EX9 6EA
Timeline
Dates from the published record
-
19 Jun 2024
Received by East Devon
-
17 Jul 2024
Decision issued: Approval with conditions
-
2 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Exeter
28 applications on PlanIndex · across 5 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Beech Tree House 11A Copp Hill Lane Budleigh Salterton EX9 6DT
Proposed single detached garage.
Granted Full applications 21 docs -
6 Vision Hill Road Budleigh Salterton Devon EX9 6EB
Minor amendment to 25/1796/FUL: change of rooflights to roof lantern
Decided Amendments Loft or dormer Windows or glazing 5 docs -
6 Vision Hill Road Budleigh Salterton EX9 6EB
Proposed rear balcony rooflight
Withdrawn Full applications Loft or dormer 6 docs -
6 Vision Hill Road Budleigh Salterton Devon EX9 6EB
Proposed single storey rear extension
Granted Full applications Extension 6 docsSmall domestic -
2 Copp Hill Lane Budleigh Salterton Devon EX9 6DT
Certificate of Lawful Development for proposed loft conversion including the installation of 6 No. Velux roof windows.
Granted Lawful development Loft or dormer Windows or glazing 5 docs -
14 Honey Park Road Budleigh Salterton EX9 6EF
Construction of dormer window to rear and installation of first floor side facing window
Granted Full applications Loft or dormer Windows or glazing 7 docs
Other full applications applications
In East Devon
-
26/1714/FUL Awaiting decision
5 Long Copp Budleigh Salterton Devon EX9 6DY
Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit
-
26/1565/FUL Granted
1 Hillymead Seaton EX12 2LF
Retrospective permission for re-landscaping the drive area
-
26/1757/FUL Awaiting decision
Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL
New porch
-
26/1571/FUL Granted
Hillsboro 44 Marlpit Lane Seaton EX12 2HL
Construction of two-storey side extension
-
26/1536/FUL Granted
Bramblings Smallridge Axminster EX13 7JL
Single storey extension to the east elevation and raised patio.