Skip to content
PlanIndex Get alerts
Menu

Planning application

24/0709/FUL

Turlings King Street Colyton EX24 6LF

Granted East Devon Full Application

Proposal

Change of use of land for siting of Shepherd's hut type structure for use as ancillary living accommodation and/or holiday let use.

As published by the council, reference 24/0709/FUL

Timeline

Dates from the published record

  1. 7 May 2024

    Received by East Devon

  2. 26 Jun 2024

    Decision issued: Approval with conditions

  3. 1 Aug 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/1017/LBC Awaiting decision

    Methodist Chapel King Street Colyton EX24 6LF

    Retrospective garden wall and associated landscaping works

    8 Jun 2026 76m away Heritage and listed buildings
  • 26/1016/FUL Awaiting decision

    Methodist Chapel King Street Colyton EX24 6LF

    Retrospective garden wall and associated landscaping works

    8 Jun 2026 76m away Full applications
  • 25/2556/DOC Awaiting decision

    Ceramtec Uk Ltd Sidmouth Road Colyton EX24 6JP

    Discharge of condition for 18/1850/MOUT: Condition 6, Part 3 (Remediation Scheme)

    11 Dec 2025 144m away Conditions
  • 26/0226/TCA Awaiting decision

    Ashlar House School Lane Colyton EX24 6NT

    T1, Eucalyptus : fell to ground level.

    5 Feb 2026 194m away Trees
  • 25/2632/TCA Awaiting decision

    St Andrews Church (footpath From Church Street To Lower Church Street) Colyton EX24 6LJ

    T1: Hawthorn - overall canopy reduction by 1.5-2m.

    22 Dec 2025 238m away Trees
  • 26/1383/TCA Awaiting decision

    3 Sunnyside South Street Colyton EX24 6EP

    x2 Lilac: remove deadwood, balanced crown reduction by up to 20% to reduce crown loading and lateral spread over neighbouring garden.

    9 Jul 2026 284m away Trees

In East Devon

  • 26/0768/FUL Granted

    2 Yew Tree Cottage New Road Beer Seaton EX12 3JR

    Replacement of doors and windows and demolition of existing single storey garage

    24 Apr 2026 Full applications
  • 26/1490/FUL Awaiting decision

    7 Broad Street Ottery St Mary EX11 1BS

    Renovation works and new rear external staircase to commercial property

    28 Jul 2026 Full applications
  • 26/1486/FUL Awaiting decision

    Holly Batch Cooks Lane Axminster EX13 5SQ

    New single storey garden room extension to rear elevation.

    27 Jul 2026 Full applications
  • 26/1363/FUL Awaiting decision

    Lower Cobden Whimple Exeter EX5 2PZ

    Full planning permission for the change of use of Barn 5 from agricultural uses to storage and distribution (Use Class B8) (Retrospective)

    23 Jul 2026 Full applications
  • 26/1505/FUL Awaiting decision

    1 Whinfield Terrace Barline Beer EX12 3LN

    Erection of replacement garage/outbuilding

    23 Jul 2026 Full applications