Planning application
Crammer Barton Broadhembury EX14 3LN
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replace 15no. windows: 1no. at ground floor & 3no. at first floor (W9 to W11 & W13) North elevation; 5no. at first floor (W1 to W5) South elevation; 1no. at ground floor & 1no. at first floor (W14 & W15) West elevation and 2no. at ground floor & 2no. at first floor (W18 to W21) East elevation; replace window with double doors on West elevation and reduce height of chimney by 3 metres on East elevation
As published by the council, reference 22/1626/LBC
Application record
- Reference
- 22/1626/LBC
- Type
- Listed Building Consent
- Status
- Approved
- Decision
- Granted As published: Approval with conditions
- Received
- 16 Aug 2022
- Validated
- 16 Aug 2022
- Decided
- 17 Nov 2022
- Ward
- Tale Vale
- Parish
- Broadhembury
- Decision by
- Delegated Decision
- Postcode
- EX14 3LN
Timeline
Dates from the published record
-
16 Aug 2022
Received by East Devon
-
17 Nov 2022
Decision issued: Approval with conditions
-
23 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
26 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
East Devon granted permission on 17 November 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Olive Tree Court Broadhembury Honiton EX14 3LN
93% historically approved · decision due ~27 Oct
Demolition of existing outbuilding and erection of 2no. outbuildings and swimming pool in rear garden (retrospective)
Awaiting decision Full applications Demolition 5 docs -
Wishes Broadhembury Devon EX14 3LN
96% historically approved · decision due ~17 Feb
Variation of Condition Number 2 (approved plans) on Planning Permission 22/2726/FUL (Single storey rear extension with terrace over) Reduce size of extension and remove terrace
Awaiting decision Amendments Extension 5 docsSmall domestic -
Wishes Broadhembury Honiton EX14 3LN
Single storey extension to the north elevation and single storey extension to the east elevation.
Granted Full applications Extension 9 docsSmall domestic
Other heritage and listed building applications
In East Devon
-
26/1829/LBC Awaiting decision
4 Porch Cottages Church Street Sidford Sidmouth EX10 9RG
Reduce height to chimney and cap-off the whole of the chimney
-
26/1935/LBC Awaiting decision
4 Causeway Cottages Causeway Beer Seaton EX12 3LF
Proposed single storey rear extension
-
26/1764/LBC Awaiting decision
12 Beer Road Seaton EX12 2PA
Replace glazed window pane only on 1no. dormer window on south elevation (W5)
-
26/1776/LBC Awaiting decision
Stanley Cottage Whitford Axminster EX13 7PE
Replace ceilings in sitting room and upstairs hallway with lath and plaster (like-for-like) after flood damage.
-
26/1711/LBC Awaiting decision
Oak Cottage Snodwell Farm Post Lane Cotleigh Devon EX14 9HZ
Various works to main house and annexe: remove lean-to extension; reinstate ceilings; underfloor heating, DPM & insulation; replace staircase & internal doors; removal & construction of new walls; new steel beam installed for roof strengthening; roof living room: replace roof, remove A-frame & trusses & reinstate historic A-frame; new insulation, timbers & steel frame; roof dining room & others: replace roof and timbers. Annexe: ceilings removed & reinstated, new steel beams installed; new party wall; floors DPM & insulation; replace internal doors with fire doors; staircase to have new balustrade & handrail; removal of wall; timber landing extended; construction of new wall; remove Upvc roof & replace with rooflight; archway blocked up with door; replacement floors. External works: all windows replaced; Rear elevation: window & door removed & central window added, rooflight replaced on first floor, window & door removed & central window added; replace fascias & guttering. 2no. bifold doors on south elevation; dormer window increased in size with Juliette balcony, ASHP, removal of chimney; exchange double door & window, 3no. rooflights, window & door removed & new window created on west elevation; hipped roof to gable on south; Bat and bird boxes