Skip to content
PlanIndex Get alerts
Menu

Planning application

Sid Lodge Sid Road Sidmouth EX10 9AJ

Granted East Devon 21/0438/FUL Full Application

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of single storey extension, new retaining wall to garden area and replacement cladding to dormers

As published by the council, reference 21/0438/FUL

Application record

Reference
21/0438/FUL
Type
Full Application
Status
Approved
Decision
Approval - standard time limit
Received
16 Feb 2021
Validated
16 Feb 2021
Decided
1 Apr 2021
Ward
Sidmouth Rural
Parish
Sidmouth
Decision by
Delegated Decision
Postcode
EX10 9AJ

Timeline

Dates from the published record

  1. 16 Feb 2021

    Received by East Devon

  2. 1 Apr 2021

    Decision issued: Approval - standard time limit

  3. 26 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Clevedon Lodge Sid Road Sidmouth EX10 9AJ

    26/1591/FUL Submitted 10 Aug 2026 3m away

    93% historically approved · decision due ~5 Oct

    Construction of extension to rear of garage.

    Awaiting decision Full applications Extension 8 docs
  • 6 Sidleigh Sid Road Sidmouth EX10 9DE

    26/1552/PRETDD Submitted 31 Jul 2026 30m away

    5-day Notice: Cherry Fell (dead) Replacement planting: Prunus sp.

    Withdrawn Trees 3 docs
  • 11 Sid Lane Sidmouth Devon EX10 9AN

    26/1615/LBC Submitted 20 Aug 2026 59m away

    94% historically approved · decision due ~15 Oct

    Replace 1no. window at ground floor and 1no. window at first floor on front (south) elevation; replace 1no. door on rear (north) elevation with stable door and patch render repair on front, rear & side (north, south & east) elevation

    Awaiting decision Heritage and listed buildings Windows or glazing 5 docs
  • Strathallan Sid Lane Sidmouth Devon EX10 9AW

    25/2559/VAR Submitted 7 Jan 2026 72m away

    96% historically approved · decision due ~4 Mar

    Variation of condition 1 (approved plans) on planning permission 25/1603/VAR (Variation of condition 1 (approved plans) on planning permission 24/1754/FUL (two storey extensions to the north and south elevations and, the addition of a porch); proposed changes in fenestration, to the porch canopy and gable on north elevation); proposed changes to projecting gable

    Awaiting decision Amendments Extension Windows or glazing 4 docs
    Small domestic
  • Strathallan Sid Lane Sidmouth Devon EX10 9AW

    25/1978/DOC Submitted 24 Sep 2025 76m away

    Discharge of Condition for 25/1603/VAR: Condition 5 (Materials)

    Decided Conditions 3 docs
  • Mulberry Cottage Sid Lane Sidmouth EX10 9AW

    26/0263/VAR Submitted 11 Feb 2026 91m away

    96% historically approved · decision due ~8 Apr

    Variation of condition number 2 (approved plans) on Planning Permission 22/2433/FUL (Installation of rooflights and dormer windows to east and west roof pitches, with solar panels to west elevation. Replacement of existing windows and doors with alterations to fenestration.) Proposal to install rooflights in lieu of the previously proposed roof dormers.

    Awaiting decision Amendments Loft or dormer Windows or glazing 3 docs

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/1536/FUL Granted

    Bramblings Smallridge Axminster EX13 7JL

    Single storey extension to the east elevation and raised patio.

    4 Aug 2026 Full applications