Skip to content
PlanIndex Get alerts
Menu

Planning application

Pitt Farm Exmouth Road Lympstone Exmouth EX8 5AF

Granted East Devon 21/0229/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion of outbuilding/garage to studio

As published by the council, reference 21/0229/FUL

Application record

Reference
21/0229/FUL
Type
Full Application
Status
Approved
Decision
Approval - standard time limit
Received
1 Feb 2021
Validated
1 Feb 2021
Decided
30 Mar 2021
Ward
Woodbury And Lympstone
Parish
Lympstone
Decision by
Delegated Decision
Postcode
EX8 5AF

Timeline

Dates from the published record

  1. 1 Feb 2021

    Received by East Devon

  2. 30 Mar 2021

    Decision issued: Approval - standard time limit

  3. 26 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Exeter

34 applications on PlanIndex · across 2 councils · 72% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land NW Of Courtlands Cross Courtlands Lane Exmouth

    25/1460/MOUT Submitted 13 Aug 2025 321m away

    91% historically approved · decision due ~12 Nov

    Outline planning permission seeking approval for access from the A376 (with matters of layout, scale, appearance and landscaping reserved) for the phased development of circa 100 dwellings, with 25% affordable housing, up to 0.4ha of employment development, sports facilities and associated infrastructure on land at Courtlands Cross, Exmouth

    Awaiting decision Outline 59 docs
    Major scheme
  • A La Ronde Summer Lane Exmouth Devon EX8 5BD

    25/1954/TRE Submitted 22 Sep 2025 370m away

    T305 Oak: reduce height of tree by 2.5-3m. Reduce lateral spread of southeastern to northwestern side of crown by 2-3m. T304 Oak: reduce height of tree by 2.5-3m. Reduce lateral spread of southeastern to northwestern side of crown by 2-3m. T306 Oak: reduce height of tree by 2.5-3m. Reduce lateral spread of low limb by 2m, using reduction via thinning technique; by removing branch sections up to 4m in length making, making pruning cuts up to 75mm in diameter. Reduce lateral spread of southeastern to northwestern side of crown by 2-3m.

    Granted Trees 7 docs
  • A La Ronde Summer Lane Exmouth Devon EX8 5BD

    25/1896/VAR Submitted 11 Sep 2025 385m away

    Variation of Condition Number 4 (limited time period on siting of structure) on Planning Permission 15/1795/FUL (Construction of visitor hut) Proposal to allow an extension of time of the welcome hut being permitted

    Granted Amendments 6 docs
  • Bronte House North Wotton Lane Lympstone Exmouth EX8 5LZ

    26/0816/TCA Submitted 27 Apr 2026 478m away

    G1: Western Red Cedars (x5) - 35% canopy reduction to approximately 1m below insulated power service cable. Cherry - fell (dead cherry tree next to the conifers).

    Decided Trees 9 docs
  • Garden Of 6 Bakers Cottages Longmeadow Road Lympstone Exmouth EX8 5LP

    25/2246/VAR Submitted 19 Nov 2025 490m away

    96% historically approved · decision due ~14 Jan

    Removal of condition 2 (Removal of Permitted Development rights), of planning permission 98/P0587 (Permission for Retention of Use of Land as Garden), to reinstate permitted development rights available to residential gardens.

    Awaiting decision Amendments 5 docs

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/1536/FUL Granted

    Bramblings Smallridge Axminster EX13 7JL

    Single storey extension to the east elevation and raised patio.

    4 Aug 2026 Full applications