Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00461/CLP

26 Chestnut Way Mepal Ely Cambridgeshire CB6 2YR

Granted East Cambridgeshire Certificate of lawfulness - proposed

Proposal

Erection of a detached single-storey brick outbuilding for domestic storage

As published by the council, reference 26/00461/CLP

Timeline

Dates from the published record

  1. 29 Apr 2026

    Received by East Cambridgeshire

  2. 22 Jun 2026

    Decision issued: Approve

  3. 23 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About lawful development applications

How this application type works

A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.

More on lawful development applications in our guide

Nearby applications

Within 500 metres

  • 18/01486/NMAA Awaiting decision

    24 Laurel Close Mepal Cambridgeshire CB6 2BN

    Non-material amendment to previously approved 18/01486/FUL for Single storey rear extension

    27 Jul 2026 154m away Amendments
  • 26/00514/FUL Awaiting decision

    12 Sutton Road Mepal Ely Cambridgeshire CB6 2AQ

    Erection of single-storey porch

    12 May 2026 162m away Full applications
  • 26/00391/FUL Granted

    Land Rear Of 3 School Lane Mepal Cambridgeshire CB6 2AJ

    Construction of 1No. detached 1 and 1/2 storey self build property

    9 Apr 2026 337m away Full applications
  • 26/00608/LBC Granted

    Wisteria House 3 Brangehill Lane Mepal Ely Cambridgeshire CB6 2AL

    Installation of Solar Panels and associated works

    3 Jun 2026 380m away Heritage and listed buildings
  • 26/00607/FUL Granted

    Wisteria House 3 Brangehill Lane Mepal Ely Cambridgeshire CB6 2AL

    Installation of Solar Panels and associated works

    3 Jun 2026 381m away Full applications

In East Cambridgeshire

  • 26/00792/CLP Awaiting decision

    111 Paddock Street Soham Cambridgeshire CB7 5JA

    Loft conversion with rear dormer and front skylights, and erection of porch

    23 Jul 2026 Lawful development
  • 26/00767/CLE Awaiting decision

    Trinity Hall Farm Collins Hill Fordham Cambridgeshire CB7 5PD

    Implementation of foundations to Barn 4 on approved planning application 23/00807/FUL

    16 Jul 2026 Lawful development
  • 26/00361/CLE Granted

    Bramble Lodge 10C Gravel End Coveney Ely Cambridgeshire CB6 2DN

    Conversion of attached double garage and loft over double garage and utility to provide home office and annexe including replacement of garage doors with insulated wall and windows and installation of 3x roof-lights

    30 Mar 2026 Lawful development
  • 26/00732/CLE Awaiting decision

    The Stables Barway Road Barway Cambridgeshire CB7 5UB

    Implementation of planning permission 16/00702/FUL for the construction of a four-bedroom detached dwelling with associated access at Land Off Barway Road, Barway Building works were commenced before the expiry of the planning permission. The works included the excavation and construction of foundations for the approved garage, which were inspected by Building Control. The building works form part of the approved residential development and are located within the application site outlined in red on the submitted plans. This application seeks a Certificate of Lawfulness for Existing Development to confirm that the planning permission was lawfully implemented by the carrying out of material operations within the required time period.

    6 Jul 2026 Lawful development
  • 26/00501/CLE Refused

    1 Stable Yard Lode Fen Lode Cambridge CB25 9HF

    Siting of caravan

    8 May 2026 Lawful development