Planning application
11 Beech Lane Ely Cambridgeshire CB7 4QZ
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
To discharge Condition 4 (air source heat pump specifications) of decision dated 12 January 2024 for 23/01082/FUL for Sustainability retrofit to existing 4 bedroom dwelling including conversion and extension of existing garage / outbuilding to additional living space
As published by the council, reference 23/01082/DISA
Application record
- Reference
- 23/01082/DISA
- Type
- Discharge of Conditions - 1st Submission
- Status
- Decided
- Decision
- Granted As published: Condition/s Discharged
- Received
- 10 Dec 2024
- Validated
- 10 Dec 2024
- Decided
- 12 Dec 2024
- Ward
- Ely East
- Parish
- Ely
- Postcode
- CB7 4QZ
Timeline
Dates from the published record
-
10 Dec 2024
Received by East Cambridgeshire
-
12 Dec 2024
Decision issued: Condition/s Discharged
-
25 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
East Cambridgeshire granted permission on 12 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
1 Beech Lane Ely Cambridgeshire CB7 4QZ
T1 Diseased Apple Tree - Cut down to clear space for garden lawn T2 Dead Tree - Cut down as dead T3 Dead Tree - Cut down as dead T4 Believed Garrya elliptica - Cut down to create light and lay lawn T5 Unknown Tree (Possible amelanchier) - Cut down to create light and lay lawn
Decided Trees 3 docs -
3 Crauden Gardens Ely Cambridgeshire CB7 4PR
G1 Lillac and Crab Apple tree - Undertake a 2 metre crown reduction T2 Lilac - Sectionally dismantle, as growing at the side of the building, to reduce the risk of damage and allow clear access down the footpath; treat the stump with Ecoplugs to prevent regrowth
Decided Trees -
Ely Cemetery Beech Lane Ely Cambridgeshire CB7 4QZ
94% historically approved · decision due ~3 Nov
T66 Purple Plum - Crown reduce northern side by up to 3m and up to 2m on the eastern, southern and western sides
Awaiting decision Trees 3 docs -
Ely Cemetery Beech Lane Ely Cambridgeshire CB7 4QZ
T43 Sycamore - Crown reduce by up to 3m T44 Robinia - Crown reduce by up to 3m
Decided Trees -
32 New Barns Road Ely Cambridgeshire CB7 4PN
T5 & T6 Sycamore trees - fell to combat subsidence damage to 30 New Barnes Road, Ely CB7 4PN
Decided Trees 4 docs -
52 Prickwillow Road Ely Cambridgeshire CB7 4QT
H1 Group of Conifers acting as a hedge - Reduce to original pruning points (By 2.5m)
Decided Trees 3 docs
Other condition discharge and variation applications
In East Cambridgeshire
-
25/00176/DISC Granted
Lake View Bereavement Centre And Crematorium Chatteris Road Mepal Cambridgeshire CB6 2AZ
To discharge Conditions 7 (Noise Impact Assessment), 26 (Flood Emergency Plan), 29 (Boundary Treatment/Gates) and 33 (Hydrant Confirmation) of planning permission ref: 25/00176/VAR3M dated 6th May 2025 (To Vary Conditions 1 (Approved Plans), 8 (Contamination), 12 (Sustainability), 13 (Operating Hours), 14 (Use of Function Room), 15 (Hard Landscaping), 16 (External Lighting), 19 (Soft Landscaping), 21 (Tree Protection), 24 (Foul Water Drainage), 25 (Surface Water Drainage), Condition 27 (External Materials), 28 (Flower Court & Function Room), 29 (Boundary Treatments), 31 (Visibility Splays), 34 (Fire Hydrants) and 35 (Delivery Times) for previously approved 21/01216/F3M dated 26 October 2022 for construction of a crematorium and associated service and administration building, function building, memorial garden, natural burial areas, pet cemetery, car parking, new vehicular access from the A142 north of the site and landscaping)
-
20/00413/DISF Decided
Land Between 3 And 5 New Road Haddenham Cambridgeshire
To discharge Conditions 3 (Soft Landscaping), 4 (Hard Landscaping), 16 (Verification Report), 29 (Future Maintenance and Management) of decision 20/00413/FUM dated 30th June 2021 for erection of 24 dwelling houses, together with access road, parking, open space, landscaping, boundary treatments and associated works
-
26/00086/DISA Granted
26 Main Street Coveney Ely Cambridgeshire CB6 2DJ
To discharge Condition 21 (Waste Collection Plan) of decision 26/00086/VAR dated 26th June 2026 to vary condition 1 (Approved plans) and remove condition 4 (Remediation scheme) and condition 5 (Remediation report) of 21/01196/FUL for construction of three detached dwellings and associated works, provision of parking, and private amenity space
-
20/01238/DISS Awaiting decision
Land To North Of Saxon Business Park Woodfen Road Littleport Cambridgeshire
To discharge Condition 56 (Residential Travel Plan) of decision 20/01238/FUM dated 25th June 2024 for Hybrid planning application seeking full planning permission for 180 dwellings, access, landscaping, sustainable urban drainage, public open space and associated primary infrastructure; and outline planning permission for up to 217 dwellings with all matters reserved except access
-
26/00208/DISA Granted
Appleacre 42 Westley Waterless Westley Waterless Cambridgeshire CB8 0RQ
To discharge conditions 5 (Scheme of Features for Protected or Priority Species) and 6 (Precautionary Working Method Statement) of Planning Permission ref: 26/00208/FUL dated 02/07/2026 (Rear two storey extension (demolished outbuilding), front/side tower extension and two new front dormer roof extensions)