Planning application
21/01771/DISA
Land Adjacent To Melton Farm Newmarket Road Burwell
Proposal
To discharge condition numbers 3 (Updated Landscaping Scheme), 4 (Detailed Section of drainage run offs), 5 (Revised lighting scheme) and 8 (Management and Maintenance Plan for the Drainage Runoffs and Soft Landscaping) of Decision dated 2.11.2022 for provision of a shared cycleway/footway west onto Ness Road, landscape, drainage, and associated infrastructure of previously approved 15/01175/OUM
As published by the council, reference 21/01771/DISA
Timeline
Dates from the published record
-
29 Mar 2023
Received by East Cambridgeshire
-
26 Jun 2026
Decision issued: Condition/s Discharged
-
23 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
22/00479/DISD Awaiting decision
Phase 2A Millstone Park Land Adjacent To Melton Farm Newmarket Road Burwell
To discharge Condition 6 (Private Lighting Scheme) of decision 22/00479/RMM dated 10th November 2023 for reserved matters for Layout, Scale, Appearance and Landscaping for Phase 2A for 133 dwellings, parking, internal roads, open space, landscaping, sustainable urban drainage and ancillary infrastructure pursuant to 15/01175/OUM (as varied by 15/01175/NMAA and 15/01175/NMAB)
-
22/00479/DISB Awaiting decision
Phase 2A Millstone Park Land Adjacent To Melton Farm Newmarket Road Burwell
To discharge Conditions 5 (Timescale for implementation of approved soft landscaping scheme and Landscape Management Plan) and 10 (Biodiversity Improvements) of decision 22/00479/RMM dated 10 November 2023 for Reserved matters for Layout, Scale, Appearance and Landscaping for Phase 2A for 133 dwellings, parking, internal roads, open space, landscaping, sustainable urban drainage and ancillary infrastructure pursuant to 15/01175/OUM (as varied by 15/01175/NMAA and 15/01175/NMAB)
-
26/00729/FUL Awaiting decision
16 Hawthorn Way Burwell Cambridgeshire CB25 0DQ
Replacement of white timber double-glazed windows with uPVC double-glazed windows and replace all timber doors with composite doors to all elevations
-
26/00730/FUL Awaiting decision
18 Hawthorn Way Burwell Cambridgeshire CB25 0DQ
Replacement of existing white double-glazed timber windows with new white double-glazed uPVC windows. To replace timber doors with composite doors on all elevations
-
26/00724/TRE Awaiting decision
95 The Causeway Burwell Cambridge Cambridgeshire CB25 0DU
T1 Ash Tree (Fraxinus excelsior) - Proposed Work: Crown Raise to approx. 3m from ground level & remove deadwood. Reason for Works: To ensure the canopy is safe from falling deadwood while simultaneously improving clearance and allowing more light to penetrate the area beneath the tree
-
21/00862/FUL Granted
26 Silver Street Burwell Cambridge CB25 0EF
Single storey extension to front and reposition of entrance door with canopy over
Other conditions applications
In East Cambridgeshire
-
19/00179/DISF Decided
Site North Of 39 Church Street Ashley Cambridgeshire CB8 9DU
To discharge Conditions 9 (Fire Hydrants), 18 (Maintenance of shared common areas) and 24 (Welcome Travel Pack) of decision 19/00179/FUM dated 20th April 2020 for Application for 16 residential dwellings (including 40% affordable) comprising two 5xbed houses, one 4xbed house, four 3xbed houses and nine 2xbed houses along with access, car parking, landscaping and associated infrastructu
-
24/00747/DISB Withdrawn
Land Adjacent 43 Mepal Road Sutton Cambridgeshire
To discharge Condition 27 (archaeological excavation report) of decision 24/00747/VARM dated 6 December 2024 to Vary Condition 4 (Assessment of Ground Conditions) of previously approved 19/01707/OUM, dated 12 April 2022 for outline planning application for the demolition of existing buildings and erection of up to 173 dwellings and provision of land for community facilities (sports pitches and burial ground), including access (not internal roads), open space, sustainable urban drainage systems and associated landscaping. All matters reserved apart from access
-
11/01077/DISH Decided
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
To discharge Condition 11 (CEMP & Waste Audit ) 16 (Spine Road Statement ) 26 (Site Access 2) 28 ( Pedestrian Crossing on Lynn Rd) of decision dated 18 June 2015 for 11/01077/ESO Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
-
26/00075/DISA Decided
Riverside Lode Fen Lode Cambridgeshire CB25 9HD
To discharge Conditions 3 (soft landscape) 5 (ecological enhancements scheme) 7 (HMMP) of decision dated 1 May 2026 for 26/00075/FUL Proposed installation of a small-scale ground mounted solar photovoltaic (PV) farm and associated works
-
22/01291/DISA Awaiting decision
Six Oaks Renewable Energy Park Newmarket Road Bottisham Cambridgeshire
To discharge Conditions 3 (CTMP), 4 (Sufficient Vehicle Turning), 7 (Surface Water), 14 (CEMP) and 16(Soft Landscaping) of decision 22/01291/ESF dated (21st December 2023) for installation of a Renewable Energy Park comprising: ground mounted solar panels; access tracks; inverters, transformers; substation and battery energy storage system; customer cabin; underground cables and conduits; perimeter fence; CCTV equipment; temporary construction compound; and associated infrastructure and planting scheme