Planning application
Premier Inn B7064 From A71 Moorfield Roundabout To A759 Kilmarnock East Ayrshire KA1 2RS
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed EV charging station comprising 12. No. EV charging points, amenity kiosk, associated plant, new vehicular access and landscaping.
As published by the council, reference 25/0646/PP
Application record
- Reference
- 25/0646/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Approved with Conditions
- Received
- 22 Dec 2025
- Validated
- 20 Jan 2026
- Decided
- 11 Mar 2026
- Ward
- Kilmarnock West And Crosshouse
- Decision by
- Delegated
- Postcode
- KA1 2RS
Site history
Applications at this address on the East Ayrshire register
This site has had 6 applications since 2024: 4 approved, 0 refused.
-
26/0072/AMCPP Awaiting decision
Premier Inn B7064 From A71 Moorfield Roundabout To A759 Kilmarnock East Ayrshire KA1 2RS
Discharge of Condition 4 (external lighting) of Planning Consent 26/0226/PP (Proposed EV charging station comprising 12 No. EV charging points, amenity kiosk, associated plant, new vehicular access and landscaping)
-
26/0405/AD Awaiting decision
Premier Inn B7064 From A71 Moorfield Roundabout To A759 Kilmarnock East Ayrshire KA1 2RS
Advertisement of the following types : 1no. Fascia Sign, 1no. infotainment screen, 1no. totem
-
26/0226/PP Granted
Premier Inn B7064 From A71 Moorfield Roundabout To A759 Kilmarnock East Ayrshire KA1 2RS
Section 42 Application to vary Condition 5 to allow the Small Unmanned kiosk to be opened within 6 months after the EV charging station commences operation of planning consent 25/0646/PP.
-
25/0071/AMCPP Granted
Premier Inn B7064 From A71 Moorfield Roundabout To A759 Kilmarnock East Ayrshire KA1 2RS
Discharge of Condition 13 (a) (Bat Boxes) and Condition 14 (a) (Low Impact Lighting Strategy) of Planning Consent 24/0269/PP.
-
24/0269/PP Granted
Premier Inn B7064 From A71 Moorfield Roundabout To A759 Kilmarnock East Ayrshire KA1 2RS
Extension to the existing hotel to provide additional bedrooms, together with other associated works.
Timeline
Dates from the published record
-
22 Dec 2025
Received by East Ayrshire
-
20 Jan 2026
Validated
Checked as complete and ready for consideration.
-
11 Mar 2026
Decision issued: Approved with Conditions
-
29 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
26/0226/PP Granted
Premier Inn B7064 From A71 Moorfield Roundabout To A759 Kilmarnock East Ayrshire KA1 2RS
Section 42 Application to vary Condition 5 to allow the Small Unmanned kiosk to be opened within 6 months after the EV charging station commences operation of planning consent 25/0646/PP.
Who's behind it
Company information only, from the register and Companies House
Gravis Planning Ltd Agent, a planning consultancy registered in Holywood
Active · incorporated 2005 · Holywood
234 applications on PlanIndex · across 40 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
- Decision notice
- Report of handling
- Approved charger specification sheet
- Approved design and access statement
- Approved existing site plan
- Approved location plan
- Approved planning statement
- Application form
- Proposed infotainment screen
- Approved proposed composite plan - amenity unit
- Approved proposed floor and roof plans - amenity unit
- Approved proposed canopy level
- Approved proposed charging units
- Approved proposed elevations 1
- Approved proposed elevations 2
- Proposed fastned signage
- Approved proposed ground level plan drainage
- Approved proposed site plan
- Proposed signage totem
- Approved transport note
Trade members open them from here.
Open the documentsWhat this grant of permission means
East Ayrshire granted permission on 11 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
OFF B7064 ADJACENT MOORFIELD ROUNDABOUT MOORFIELD KILMARNOCK Ayrshire KA1 2RS
Construct 78 No. Houses And Associated Landscaping
Withdrawn Reserved mattersMajor scheme -
THE COTTON MILL MOORFIELD ROUNDABOUT KILMARNOCK Ayrshire KA1 2RS
Alterations To Restaurant And Erection Of Smoking Canopy
Granted Full applications -
MOORFIELD OFF B7064 ADJACENT MOORFIELD ROUNDABOUT KILMARNOCK Ayrshire KA1 2RS
Proposed 4 Arm Roundabout To Serve Future Development Sites
Granted Full applications -
Land At Neephill Kilmarnock KA1 2RS
Erection of two storey detached house, stable block and detached garage
Withdrawn Outline New dwelling 6 docs -
MOORFIELD INDUSTRIAL ESTATE KILMARNOCK Ayrshire KA1 2RS
Proposed Erection Of Industrial Unit, Associated Parking And New Access From Moorfield Roundabout
Granted Full applications -
Premier Inn B7064 From A71 Moorfield Roundabout To A759 Kilmarnock East Ayrshire KA1 2RS
Extension to the existing hotel to provide additional bedrooms, together with other associated works.
Granted Full applications Extension 31 docs
Other full applications
In East Ayrshire
-
26/0346/PP Granted
8 Taylor Brown Close Stewarton East Ayrshire KA3 5DG
Replacement of existing rear conservatory with single storey rear extension
-
26/0103/PP Granted
Burnton Farm A76t From Afton Bridgend To C47 Mansefield Road New Cumnock East Ayrshire KA18 4NW
Erection of house and detached garage and demolition of farm buildings.
-
26/0176/PP Granted
Grassyards Farm Grassyards Road New Farm Loch Kilmarnock East Ayrshire KA3 6HZ
Change of use to waste transfer facility (Class 5) in retrospect
-
26/0303/PP Granted
25-31 King Street Kilmarnock KA1 1PT
Change of use on ground floor of middle unit only (number 29) Class 1a to Class 3, installation of new windows, re-opening of former window openings and associated alterations.
-
26/0017/PP Granted
3 Kilmarnock Road Mauchline East Ayrshire KA5 5DB
Painting of gable wall to form mural