Skip to content
PlanIndex Get alerts
Menu

Planning application

Laight A713 From Waterside To B741 Dalmellington Doon Valley Dalmellington Ayr East Ayrshire KA6 7PX

Granted East Ayrshire 18/0345/PP Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of agricultural land and erection of self catering holiday lodges with access road including septic tank drainage system

As published by the council, reference 18/0345/PP

Application record

Reference
18/0345/PP
Type
Planning Permission
Status
Decided
Decision
Approved with Conditions
Received
27 Apr 2018
Validated
18 May 2018
Decided
27 Sep 2018
Ward
Doon Valley
Parish
Dalmellington
Decision by
Delegated
Postcode
KA6 7PX

Timeline

Dates from the published record

  1. 27 Apr 2018

    Received by East Ayrshire

  2. 18 May 2018

    Validated

    Checked as complete and ready for consideration.

  3. 27 Sep 2018

    Decision issued: Approved with Conditions

  4. 12 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Tom Sweeney Architectural Services Agent, an architecture practice

14 applications on PlanIndex · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

  • Approved / approved with conditions Decision Notices · 27 Sep 2018
  • Report of handling Reports (Public) · 27 Sep 2018
  • Approved location plan Drawings / Plans · 31 Jul 2018
  • Approved site plan Drawings / Plans · 31 Jul 2018
  • Cumnock chronicle advert Other · 30 May 2018
  • Kilmarnock standard Public Notices · 30 May 2018
  • Ownership form Application Form · 15 May 2018
  • Approved general location plan Drawing · 27 Apr 2018
  • Approved site plan as existing Drawing · 27 Apr 2018
  • Site plan as proposed Drawing · 27 Apr 2018
  • Location plan Drawing · 27 Apr 2018
  • Approved micro lodge floor plans and elevations Drawing · 27 Apr 2018
  • Planning design and access statement Reports (Public) · 27 Apr 2018
  • Application pdf Application Form · 27 Apr 2018

Trade members open them from here.

Open the documents

What this grant of permission means

East Ayrshire granted permission on 27 September 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In East Ayrshire

  • 26/0103/PP Granted

    Burnton Farm A76t From Afton Bridgend To C47 Mansefield Road New Cumnock East Ayrshire KA18 4NW

    Erection of house and detached garage and demolition of farm buildings.

    10 Mar 2026 Full applications
  • 26/0176/PP Granted

    Grassyards Farm Grassyards Road New Farm Loch Kilmarnock East Ayrshire KA3 6HZ

    Change of use to waste transfer facility (Class 5) in retrospect

    15 Apr 2026 Full applications
  • 26/0303/PP Granted

    25-31 King Street, Kilmarnock, KA1 1PT

    Change of use on ground floor of middle unit only (number 29) Class 1a to Class 3, installation of new windows, re-opening of former window openings and associated alterations.

    23 Jun 2026 Full applications
  • 26/0017/PP Granted

    3 Kilmarnock Road Mauchline East Ayrshire KA5 5DB

    Painting of gable wall to form mural

    19 Jan 2026 Full applications
  • 26/0172/PP Granted

    Grange Nursing Home 4 Grange Terrace Grange Kilmarnock East Ayrshire KA1 2JR

    Proposed single storey rear extension to existing care home

    13 Apr 2026 Full applications