Skip to content
PlanIndex Get alerts
Menu

Planning application

Beechwood Park Coal Road Auchinleck Cumnock East Ayrshire KA18 2AG

Granted East Ayrshire 15/0715/PP Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of two units (retrospective) and erection of a replacement pie hut

As published by the council, reference 15/0715/PP

Application record

Reference
15/0715/PP
Type
Planning Permission
Status
Decided
Decision
Approved with Conditions
Received
25 Sep 2015
Validated
5 Feb 2016
Decided
14 Mar 2016
Ward
Ballochmyle
Decision by
Delegated
Postcode
KA18 2AG

Site history

Applications at this address on the East Ayrshire register

This site has had 5 applications since 2013: 5 approved, 0 refused.

  • 19/0798/PP Granted

    Beechwood Park Coal Road Auchinleck Cumnock East Ayrshire KA18 2AG

    Installation of 4 no. 15 metre floodlights and 8 no. 6 metre floodlights

    Decided 3 Mar 2020 Full applications
  • 19/0565/PP Granted

    Beechwood Park Coal Road Auchinleck Cumnock East Ayrshire KA18 2AG

    Extensions to bar and cellar

    Decided 4 Oct 2019 Full applications
  • 15/0064/PP Granted

    Beechwood Park Coal Road Auchinleck Cumnock East Ayrshire KA18 2AG

    Installation of portacabin and storage container, in retrospect.

    Decided 8 Jun 2015 Full applications
  • 13/0345/PP Granted

    Beechwood Park Coal Road Auchinleck Cumnock East Ayrshire KA18 2AG

    Erection of new spectator enclosure over existing terrace

    Decided 11 Jul 2013 Full applications

Timeline

Dates from the published record

  1. 25 Sep 2015

    Received by East Ayrshire

  2. 5 Feb 2016

    Validated

    Checked as complete and ready for consideration.

  3. 14 Mar 2016

    Decision issued: Approved with Conditions

  4. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

28 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

East Ayrshire granted permission on 14 March 2016, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In East Ayrshire

  • 26/0172/PP Granted

    Grange Nursing Home 4 Grange Terrace Grange Kilmarnock East Ayrshire KA1 2JR

    Proposed single storey rear extension to existing care home

    13 Apr 2026 Full applications
  • 26/0363/PP Granted

    The Steading Cloncaird Farm B742 From A713 To At South Ayrshire Boundary At Snipe Loch Doon Valley East Ayrshire KA6 6ES

    Erection of double garage

    22 Jul 2026 Full applications
  • 26/0085/PP Granted

    12 Polwarth Street Galston East Ayrshire KA4 8HG

    Proposed change of use of vacant shop premises to part of dwellinghouse and associated alterations including new window and door

    27 Feb 2026 Full applications
  • 26/0086/PP Granted

    220M South West Of Fowler Farm U734 Hillhead And Auchmillan From A76 At Mauchline To B7037 Nr Auchmannoch Bridge Mauchline East Ayrshire KA5 6HB

    Proposed 39500 bird free range laying facility with litter store, associated meal storage bins, new access and turning facility for artic lorries

    27 Feb 2026 Full applications
  • 26/0281/PP Granted

    14 Lugar Street Cumnock East Ayrshire KA18 1AB

    Construction of Office (Class 4) for temporary use (10 years) and removal of trees

    15 Jun 2026 Full applications