Skip to content
PlanIndex Get alerts
Menu

Planning application

261 Northfield Avenue Ealing W5 4UA London

Granted Old Oak and Park Royal Development Corporation P/2007/5411 Discharge Condition

Works: New dwelling Extension Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details/ samples of materials to be used for the external surfaces of the development (bricks) part pursuant to condition 2 of planning permission ref: P/2006/1298-LB dated 02/08/2007 for 'Three storey rear extension (at basement/lower ground to first floor levels) to provide two self-contained flats (to basement/lower ground floor level and first floor level) and extension to existing pharmacy (at ground floor level); conversion of existing first/second floor residential unit to two self-contained flats (to provide a total of four self-contained residential units); refuse storage and external alterations (following demolition of existing basement/ground floor rear extension)'

As published by the council, reference P/2007/5411

Application record

Reference
P/2007/5411
Type
Discharge Condition
Status
Approved
Decision
Granted As published: Approved
Received
2 Aug 2007
Validated
2 Aug 2007
Decided
2 Dec 2010
Ward
Northfield
Decision by
Delegated Decision
Postcode
W5 4UA

Timeline

Dates from the published record

  1. 2 Aug 2007

    Received by Old Oak and Park Royal Development Corporation

  2. 2 Dec 2010

    Decision issued: Approved

  3. 21 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Steven Lenczer Architects Agent, an architecture practice

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

What this grant of permission means

Old Oak and Park Royal Development Corporation granted permission on 2 December 2010, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 264 Northfield Avenue Ealing W5 4UB

    233061OUT Submitted 26 Jul 2023 50 yards away

    Construction of four-storey side extension (including existing stair core enlargement); construction of four storey rear extension; enlargement to the existing fourth floor; construction of additional storey (fifth floor); internal alterations all to provide an additional 37 rooms to hotel (Use Class C1)(total 96 bedrooms); installation of canopy to main front entrance; alterations to front, rear, side fenestrations; external materials upgrade to existing front facade (Outline Planning Application - Details of Access, Landscaping, Layout and Scale sought only, with Appearance as Reserved Matters)

    Withdrawn Extension
  • 275 Northfield Avenue Ealing London W5 4UA

    214755HH Submitted 14 Jul 2021 50 yards away

    Construction of a single storey outbuilding

    Refused Householder 11 docs
    Small domestic
  • 283 Northfield Avenue Ealing W5 4UA

    244326CPL Submitted 18 Nov 2024 50 yards away

    Single storey rear extension (Lawful Development Certificate for a Proposed Development)

    Refused Lawful development Extension 9 docs
    Small domestic
  • 11 Blondin Avenue Ealing London W5 4UL

    214083PALHE Submitted 28 May 2021 100 yards away

    Single storey (Max 3.40m deep and Max 3m high) rear extension (42 days Prior Notification Process)

    Granted Prior approval Extension 7 docs
    Small domestic
  • 11 Blondin Avenue Ealing London W5 4UL

    213950CPL Submitted 28 May 2021 100 yards away

    Rear roof extension incorporating Juliet balcony; and installation of three roof lights to front roof slope; following the removal of rear chimney (Lawful Development Certificate for Proposed Development

    Granted Lawful development Extension Loft or dormer 8 docs
  • 11 Blondin Avenue Ealing London W5 4UL

    214083PALHE Submitted 28 May 2021 100 yards away

    Single storey (Max 3.40m deep and Max 3m high) rear extension (42 days Prior Notification Process)

    Granted Prior approval Extension 7 docs
    Small domestic

In Old Oak and Park Royal Development Corporation

  • 260596CND Withdrawn

    Phase 3, Friary Park Estate The Drive, Joseph Avenue, Sparks Close & Friary Road Acton W3 6NL

    Details of a construction logistic plan pursuant to condition 51 of planning permission ref: 243424FUL dated 30.01.2026 'Full planning permission for the demolition of all existing structures, site preparation works and the construction of Block C (1-24 storeys), Block D (1-12 storeys) comprising 693 homes (Use Class C3), 450sq.m community centre (Use Class E(f)/F1/F2), 98sq.m of non-residential floorspace for Commercial, Business & Service Floorspace (Use Class E), cycle and vehicle parking, highway and access improvements, childrens play space, public realm and landscape enhancements. An Environmental Statement has been submitted with the application under the Town & Country Planning (Environmental Impact Assessment) Regulation 2017, as amended.'

    Received 16 Feb, published by the council 3 Aug 2026 Conditions
  • 263579CND Granted

    Long Acre Court Argyle Road West Ealing W13 0DA

    Details of the Internal Sound Insulation Desktop Assessment pursuant to condition 10 of planning permission 216999FUL dated 25.11.2022 for 'Construction of a three-storey building to provide 9 self-contained flats (following demolition of existing garage); and associated amenity, cycle storage, landscaped, vehicle parking, and waste storage spaces'

    Received 13 Aug, published by the council 1 Oct 2026 Conditions
  • 262838CND Granted

    Twyford Abbey Nursing Home Twyford Abbey Road Park Royal NW10 7DP

    Details of travel plan (Phase D) (Blocks G and H), part pursuant to condition 5 of planning permission reference 222341FUL dated 09.02.2023 for 'Development to provide a total of 326 self-contained residential units comprising; phased construction of seven blocks of flats (ranging from two to six-storeys); two two-storey detached dwellinghouses (following demolition of existing gatehouse); and a terrace of two-storey dwellinghouses in the grounds of Twyford Abbey (all Use Class C3); conversion of Twyford Abbey (Grade II Listed) into flats (Use Class C3) and provision of residents lounge; demolition of workshop attached to the Grade II listed walled garden and replacement with a single storey dwellinghouse (Use Class C3); facilitated by repair; refurbishment; infill and rooftop extensions; demolition of post-war extensions and other pre-war structures within grounds, excluding the cottage; retention and repair of the Grade II listed walled garden and attached cottage to provide ancillary facilities management accommodation and residents facilities; comprehensive landscaping works including removal and works to trees and groups of trees protected by a Tree Preservation Order; provision of permissive publicly accessible open space and grow gardens; provision of gated cycle and pedestrian access onto North Circular (A406) and new access onto Twyford Abbey Road; provision of hardstanding parking areas; ecological enhancement works; and other associated constructions works including installation of boundary treatment'

    Received 26 Jun, published by the council 27 Jul 2026 Conditions
  • 263073CND Granted

    The Arches Business Centre Merrick Road Southall UB2 4AU

    Details of contractual arrangement with a certified contractor for ongoing maintenance of renewable/low-carbon energy equipment part pursuant to condition 20 (Part B only) of planning permission 181380FUL dated 22.12.2021 for: 'Demolition of existing structures and residential-led, mixed use redevelopment to provide four buildings ranging in height from 15 to 23 storeys comprising residential (575 units), 2,100 sq m of B1(a) office floorspace, 449 sq m of flexible commercial floorspace (Use Classes A1, A2, A3, B1a and D1), erection of a boundary wall along the railway line, along with landscaping, play and amenity space, cycle parking, servicing bays, plant and refuse areas, and new access arrangements.'

    Received 11 Aug, published by the council 1 Oct 2026 Conditions
  • 262832CND Granted

    Twyford Abbey Nursing Home Twyford Abbey Road Park Royal NW10 7DP

    Details of delivery and servicing plan Phase D (Blocks G and H), part pursuant to condition 26 of planning permission reference 222341FUL dated 09.02.2023 for 'Development to provide a total of 326 self-contained residential units comprising; phased construction of seven blocks of flats (ranging from two to six-storeys); two two-storey detached dwellinghouses (following demolition of existing gatehouse); and a terrace of two-storey dwellinghouses in the grounds of Twyford Abbey (all Use Class C3); conversion of Twyford Abbey (Grade II Listed) into flats (Use Class C3) and provision of residents lounge; demolition of workshop attached to the Grade II listed walled garden and replacement with a single storey dwellinghouse (Use Class C3); facilitated by repair; refurbishment; infill and rooftop extensions; demolition of post-war extensions and other pre-war structures within grounds, excluding the cottage; retention and repair of the Grade II listed walled garden and attached cottage to provide ancillary facilities management accommodation and residents facilities; comprehensive landscaping works including removal and works to trees and groups of trees protected by a Tree Preservation Order; provision of permissive publicly accessible open space and grow gardens; provision of gated cycle and pedestrian access onto North Circular (A406) and new access onto Twyford Abbey Road; provision of hardstanding parking areas; ecological enhancement works; and other associated constructions works including installation of boundary treatment'

    Received 26 Jun, published by the council 27 Jul 2026 Conditions