Planning application
Acton Town Underground Station Gunnersbury Lane Acton W3 8HN
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Works to Platform 2, including removal of 3 existing cameras; installation of six cameras and associated trunking; installation of two Monitor Display Arrays (MDAs) (Listed Building Consent)
As published by the council, reference 262876LBC
Application record
- Reference
- 262876LBC
- Status
- Pending Consideration
- Received
- 23 Jul 2026
- Validated
- 23 Jul 2026
- Ward
- South Acton
- Postcode
- W3 8HN
Comment by 9 September 2026
The council is taking comments on this application until then. Comments go to Ealing through their own planning portal.
Timeline
Dates from the published record
-
23 Jul 2026
Received by Ealing
-
30 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 17 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Ealing took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy
21 applications on PlanIndex · across 8 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Ealing for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Ealing is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
Acton Town Underground Station Gunnersbury Lane Acton W3 8HN
Replacement of existing Variable information Display (VID) on Platforms 1, 2 and 3 and installation of additional VIDs on Platforms 1 and 2 and associated infrastructure (Listed Building Consent)
Granted Heritage and listed buildings 12 docs -
Acton Town Underground Station Gunnersbury Lane Acton W3 8HN
Replacement of existing Variable information Display (VID) on Platforms 1, 2 and 3 and installation of additional VIDs on Platforms 1 and 2 and associated infrastructure (Listed Building Consent)
Granted Heritage and listed buildings 12 docs -
Acton Town Underground Station Gunnersbury Lane Acton W3 8HN
Installation of new One Person Operations (OPO) cameras, brackets etc for a new Platform-Train Interface System with retention and eventually removal of existing OPO cameras, brackets etc to enable the introduction of new rolling stock to the Piccadilly Line as part of the Piccadilly Line Upgrade Project and associated works. (Listed Building Consent)
Granted Heritage and listed buildings 14 docs -
Acton Town Underground Station Gunnersbury Lane Acton W3 8HN
Installation of new One Person Operations (OPO) cameras, brackets etc for a new Platform-Train Interface System with retention and eventually removal of existing OPO cameras, brackets etc to enable the introduction of new rolling stock to the Piccadilly Line as part of the Piccadilly Line Upgrade Project and associated works. (Listed Building Consent)
Granted Heritage and listed buildings 14 docs -
Challenger House, 125 Gunnersbury Lane, Acton, London, W3 8LH
Prior Approval for the change of use of the building's existing basement floor office (Class E) to a self-contained one bedspace, one person studio flat (Class C3).
Granted Prior approval 10 docs -
Challenger House 125 Gunnersbury Lane Acton W3 8LH
Prior Approval for the change of use of the building's existing lower ground floor office (Class E) to a self-contained one bedroom, one person flat (Class C3). (Out of borough)
Granted Outline 9 docs