Planning application
17 Wolverton Gardens Ealing W5 3LJ
Works: Loft or dormer Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of two dormer windows within the existing rear and flank roof slopes (following the removal of two existing windows from the rear roof slope); installation of glazed doors and a Juliet balcony at first-floor level; insertion of a new side-facing first-floor window; and installation of three rooflights within the front roof slope; installation of one rooflight within the flat roof; and reinstatement of the half timbering feature to front elevation.
As published by the council, reference 262120FUL
Application record
- Reference
- 262120FUL
- Status
- Granted with Conditions
- Decision
- Granted with Conditions
- Received
- 26 May 2026
- Validated
- 26 May 2026
- Decided
- 17 Aug 2026
- Ward
- Ealing Common
- Postcode
- W5 3LJ
Timeline
Dates from the published record
-
26 May 2026
Received by Ealing
-
25 Jul 2026
Added to PlanIndex
-
17 Aug 2026
Decision issued: Granted with Conditions
-
23 Aug 2026
Status changed to Granted with Conditions
Previously Pending Consideration.
Who's behind it
Company information only, from the register and Companies House
ANA Architecture and Design Agent, an architecture practice registered in Ashford
Dissolved · incorporated 2012 · Ashford
2 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
- PROP ELEV
- DECISION NOTICE
- OFFICERS REPORT
- DAS
- LAMP POST
- CONSERVATION SITE NOTICE
- APPLICATIONFORMREDACTED
- EXT PLANS
- EXT PLANS
- EX ELEVATIONS
- 235AL(-)04EXREV
- PROP PLANS
- PROP PLANS
- 235AL(1)04PRREV
- 220526AHMPLA
- LOCATIONPLAN
- LOCATIONPLAN
Trade members open them from here.
Open the documentsWhat this grant of permission means
Ealing granted permission on 17 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Ealing's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
13 Wolverton Gardens Ealing W5 3LJ
Details of Noise Assessment Report pursuant to Condition 8 of planning permission ref: 253381FUL dated 27th February 2026
Granted 4 docs -
13 Wolverton Gardens Ealing W5 3LJ
Details of Enhanced Sound Insulation Values of at least 5dB, as necessary above the ADE Building Regulations value for residential use, of the floor/ ceiling/ walls separating different types of rooms from neighbouring flats in relation to Condition 11 of planning permission ref: 253381FUL dated 27th February 2026
Granted New dwelling 4 docs -
13 Wolverton Gardens Ealing W5 3LJ
Details of External Noise from Machinery, Equipment, Extract/Ventilation Ducting, Mechanical Installations in relation to Condition 9 of planning permission ref: 253381FUL dated 27th February 2026
Granted 4 docs -
13 Wolverton Gardens Ealing W5 3LJ
Details of Enhanced Sound Insulation Values of at least 5dB, as necessary above the ADE Building Regulations value for residential use, of the floor/ ceiling/ walls separating different types of rooms from neighbouring flats in relation to Condition 11 of planning permission ref: 253381FUL dated 27th February 2026
Granted Conditions New dwelling 4 docs -
13 Wolverton Gardens Ealing W5 3LJ
Details of Noise Assessment Report pursuant to Condition 8 of planning permission ref: 253381FUL dated 27th February 2026
Granted Conditions 4 docs -
13 Wolverton Gardens Ealing W5 3LJ
Details of External Noise from Machinery, Equipment, Extract/Ventilation Ducting, Mechanical Installations in relation to Condition 9 of planning permission ref: 253381FUL dated 27th February 2026
Granted Conditions 4 docs