Skip to content
PlanIndex Get alerts
Menu

Planning application

Park Royal Road East And West Sites

Granted Ealing 254745CONS Consultation by Other Boroughs

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Partial discharge of condition 6 (i) ((a) Ground Conditions & (b) Remediation Report) pursuant to planning permission 23/0014/FUMOPDC dated 27/03/2025 for demolition of all existing buildings and structures and the redevelopment of the sites through construction of a building known as Block A (east site) for student accommodation (sui generis) with ancillary facilities including classrooms, flexible space and two auditoriums, and light industrial use (Class E(g)(iii)); construction of a second building known as Block B (west site) comprising residential units (use class C3) with flexible commercial uses (Class E) at ground and lower ground floor; and, associated works of landscaping, public realm improvements and other works associated with the development. The application is accompanied by an Environmental Statement. (Out of borough)

As published by the council, reference 254745CONS

Application record

Reference
254745CONS
Type
Consultation by Other Boroughs
Status
No Objection
Decision
Granted As published: No Objection
Received
12 Dec 2025
Validated
12 Dec 2025
Decided
19 Dec 2025
Decision by
Delegated Decision

Site history

Applications at this address on the Ealing register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 262924OPDCOB Granted

    Park Royal Road East And West Sites

    Details of condition 9 (Fibre Connectivity Plans) for Block A pursuant to planning permission reference 23/0014/FUMOPDC dated 26/03/2025 for Demolition of all existing buildings and structures and the redevelopment of the sites through construction of a building known as Block A (east site) for student accommodation (sui generis) with ancillary facilities including classrooms, flexible space and two auditoriums, and light industrial use (Class E(g)(iii)); construction of a second building known as Block B (west site) comprising residential units (use class C3) with flexible commercial uses (Class E) at ground and lower ground floor; and, associated works of landscaping, public realm improvements and other works associated with the development. The application is accompanied by an Environmental Statement ( out of borough)

    Decided 17 Aug 2026

Timeline

Dates from the published record

  1. 12 Dec 2025

    Received by Ealing

  2. 19 Dec 2025

    Decision issued: No Objection

  3. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Ealing granted permission on 19 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Ealing

  • 263226OPDCOB Granted

    Shell Park Royal Service Station Royal Leisure Park Kendal Avenue Acton W3 0BX

    Application for Prior Approval under Schedule 2, Part 16, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) for the removal of the existing 17m monopole and 4 no. equipment cabinets, and replacement with a 20m monopole and 3 no. equipment cabinets, the relocation of 1 no. existing equipment cabinet and ancillary development thereto (Out of Borough)

    Received 21 Aug, published by the council 26 Aug 2026 Outline
  • 263099CONS Decided

    Gunnersbury Park, Popes Lane Ealing W3 8LQ

    Temporary change of use of areas of Gunnersbury Park for the staging of temporary events between 01 January 2027 and 31 December 2031. Up to 19 live event days per calendar year, with a total of 115 days including set-up, inactive and removal days, and trackway. Including the erection of associated temporary structures, fencing, ancillary concessions and facilities. (Out of Borough from Hounslow)

    Received 12 Aug, published by the council 13 Aug 2026 Outline
  • 262400CONS Decided

    Gunnersbury Park, Popes Lane Ealing W3 8LQ

    Temporary change of use of areas of Gunnersbury Park for the staging of temporary events between 01 January 2027 and 31 December 2031. Up to 22 live event days per calendar year, with a total of 115 days including set-up, inactive and removal days. Including the erection of associated temporary structures, fencing, ancillary concessions and facilities. (out of borough)

    Received 12 Jun, published by the council 25 Jul 2026 Outline
  • 263228OPDCOB Awaiting decision

    Land Between Wagamama CPU 1 And CPU 3 Brunel Road Acton W3 7XR

    Erection of a raised deck and installation of 6no. external cold room condenser plant, and associated works( out of borough)

    Received 24 Aug, published by the council 26 Aug 2026 Outline
  • 261872OPDCOB Granted

    4 Portal Way Acton W3 6RT

    Application under Section 96A of the Town and Country Planning Act 1990 (as amended), for a non-material amendment pursuant to planning permission reference 24/0051/FUMOPDC dated 04/12/2025 for 'Demolition of all existing buildings and structures on site and the mixed-use redevelopment of the site to provide two buildings, comprising residential units (Use Class C3), a hotel (Use Class C1), commercial, business and service units (Use Class E), podium level, car and cycle parking, refuse and service areas, plant, access, hard and soft landscaping, public realm and highway works and other works associated with the development. The application is accompanied by an Environmental Statement.' Changes are proposed to the number of residential units and overall housing mix, the total floorspace of hotel and commercial, business and service uses, the internal layout, facade treatment, car and cycle parking, and other associated changes (Out of Borough)

    Received 29 Apr, published by the council 25 Jul 2026 Outline