Planning application

54 Portree Avenue Broughty Ferry Dundee DD5 3EQ

Granted Dundee City 26/00359/FULL Full Application Local

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of two storey extension

As published by the council, reference 26/00359/FULL

Application record

Reference
26/00359/FULL
Type
Full Application Local
Status
Decided
Decision
Approved subject to conditions
Received
5 Jun 2026
Validated
11 Jun 2026
Decided
27 Jul 2026
Ward
The Ferry
Parish
Broughty Ferry Community Council
Decision by
Delegated Decision
Postcode
DD5 3EQ

Timeline

Dates from the published record

  1. 5 Jun 2026

    Received by Dundee City

  2. 11 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 27 Jul 2026

    Decision issued: Approved subject to conditions

  4. 28 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

DSB Design Ltd Agent, a design practice registered in Monifieth

Active · incorporated 2015 · Monifieth

50 applications on PlanIndex · across 5 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

  • REPORT OF HANDLING Report of Handling · 27 Jul 2026
  • PLANNING PERMISSION APPROVAL Decision Notice · 27 Jul 2026
  • ACKNOWLEDGEMENT Application Acknowledgement · 12 Jun 2026
  • 05 - EXISTING SITE PLAN Drawing · 11 Jun 2026
  • INVALID LETTER Correspondence · 10 Jun 2026
  • APPLICATION SUMMARY PDF Application Form · 05 Jun 2026
  • 03 - EXISTING FLOOR PLANS AND ELEVATIONS Drawing · 05 Jun 2026
  • APPLICATION FORM Application Form · 05 Jun 2026
  • 01 - LOCATION PLAN Drawing · 05 Jun 2026
  • 04 - PROPOSED FLOOR PLANS AND ELEVATIONS Drawing · 05 Jun 2026
  • 02 - PROPOSED SITE PLAN Drawing · 05 Jun 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Dundee City granted permission on 27 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 18 Portree Avenue Broughty Ferry Dundee DD5 3EQ

    04/00201/FUL Submitted 8 Mar 2004 32m away

    Erection of 2 storey extension on south elevation

    Granted Full applications Extension 1 doc
  • 7 Broadford Terrace Broughty Ferry Dundee DD5 3EF

    21/00349/FULL Submitted 11 May 2021 53m away

    Erection of decking and boundary fencing (retrospective)

    Granted Full applications 10 docs
  • 1 Portree Avenue Broughty Ferry Dundee DD5 3EG

    25/00677/FULL Submitted 10 Dec 2025 66m away

    Two storey extension

    Granted Full applications Extension 13 docs
  • 1 Portree Avenue Broughty Ferry Dundee DD5 3EG

    26/0015/NMV Submitted 9 Jun 2026 66m away

    EX-26-A , Existing Block Plan Existing SVP added to roof area. EX-27-A , Existing Floor Plans Sink added and hob relocated within the kitchen on the ground floor plan. EX-28-A , Existing Elevations Conservatory door added to south elevation. SVP added to all relevant elevations. Extract terminal for first floor shower room added to south elevation. EX-29-A , Existing Roof Plan Existing SVP added to roof area. PL-200-A , Proposed Block Plan Existing SVP added and redirected to proposed roof. PL-300-A , Proposed Floor Plans Sink added and hob relocated within the kitchen on the ground floor plan. Existing boiler relocated from the east elevation to the south elevation. South elevation window removed. Office 2 bi-fold door orientation mirrored. PL-301, Proposed Roof Plan Existing SVP added and redirected to proposed roof. PL-500-A, Proposed Elevations Existing boiler relocated from the east elevation to the south elevation. South elevation window removed. Conservatory door added to south elevation. SVP added to all relevant elevations. Office 2 bi-fold door orientation mirrored on the proposed east elevation.

    Granted Conditions Extension Windows or glazing 9 docs
  • 40 Portree Avenue Broughty Ferry Dundee DD5 3EQ

    25/00493/FULL Submitted 2 Sep 2025 67m away

    Erection of extension

    Withdrawn Full applications Extension 15 docs
  • 25 Morlich Gardens Broughty Ferry Dundee DD5 3JA

    08/00006/FUL Submitted 3 Jan 2008 110m away

    Extension to Rear of Domestic Garage to Form Utility Room

    Granted Full applications Extension 6 docs

In Dundee City

  • 25/00660/FULL Granted

    Land To South Of Diy Warehouse Kings Cross Road Dundee

    Formation of external vehicle storage area and associated works

    28 Nov 2025 Full applications
  • 26/00007/FULL Granted

    Land To East Of Ballumbie Road Dundee

    Erection of 42 dwellinghouses (change of house type and plot layout of planning permission 20/00423/FULM)

    7 Jan 2026 Full applications
  • 26/00008/FULL Granted

    Land To East Of Ballumbie Road Dundee

    Erection of 35 dwellinghouses (change of house type and plot layout of planning permission 20/00423/FULM)

    7 Jan 2026 Full applications
  • 26/00006/FULL Granted

    Land To East Of Ballumbie Road Dundee

    Erection of 42 dwellinghouses (change of house type and plot layout of planning permission 20/00423/FULM)

    6 Jan 2026 Full applications
  • 26/00485/FULL Granted

    48 Peel Street Dundee DD2 3TZ

    Erection of garage

    6 Aug 2026 Full applications