Skip to content
PlanIndex Get alerts
Menu

Planning application

25/00556/FULL

Car Park Tesco Stores Ltd Riverside Drive Dundee

Granted Dundee City Full Application Local

Proposal

Installation of self service laundry kiosk

As published by the council, reference 25/00556/FULL

Timeline

Dates from the published record

  1. 6 Oct 2025

    Received by Dundee City

  2. 27 Nov 2025

    Decision issued: Approved subject to conditions

  3. 28 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/00555/ADV Granted

    Car Park Tesco Stores Ltd Riverside Drive Dundee

    Advertisement of the following type: Illuminated fascia sign

    6 Oct 2025 8m away Advertising
  • 26/00001/CLPUD Granted

    Tesco Stores Ltd Riverside Drive Dundee DD2 1UG

    Replacement of the existing below ground fuel storage vessels with like for like in terms of capacity but replaced for new double skin steel.

    5 Jan 2026 203m away Outline
  • 26/00323/TPO Decided

    170 Nethergate Dundee DD1 4EE

    Two lime trees either side of entrance - Prune and deadwood of the two lime trees. No more than 15% crown reduction.

    22 May 2026 232m away Trees
  • 25/00518/TREE Decided

    170 Nethergate Dundee DD1 4EE

    Two lime trees either side of entrance - Removal of the two trees

    16 Sep 2025 232m away Trees
  • 25/00652/S42 Withdrawn

    Nethergate House 158 Nethergate Dundee DD1 4DY

    Change of use from class 2 to class 3 and public house and formation of external dining areas and external bar. (Section 42 application to amend condition 4 b) of 19/00148/FULL to allow amplified music and vocal in the outdoor seating area).

    26 Nov 2025 278m away
  • 25/00473/LBC Granted

    2/1 143A Nethergate Dundee DD1 4DP

    Replacement windows

    22 Aug 2025 280m away Heritage and listed buildings

In Dundee City

  • 26/00300/FULL Granted

    Glengaa 8A Dalhousie Road Broughty Ferry Dundee DD5 2SQ

    Roof dormer with balcony and external alterations

    12 May 2026 Full applications
  • 26/00451/FULL Awaiting decision

    99 Monifieth Road Broughty Ferry Dundee DD5 2SL

    Erection of a single-storey extension to the dwelling to provide a utility room. Internal alterations to improve and rationalise the existing layout.

    20 Jul 2026 Full applications
  • 26/00447/FULL Awaiting decision

    49 Grove Road Broughty Ferry Dundee DD5 1JP

    Alterations to garage

    20 Jul 2026 Full applications
  • 26/00339/FULL Granted

    2 Cox Street Dundee DD3 9HA

    Installation of ATM

    1 Jun 2026 Full applications
  • 26/00441/FULL Awaiting decision

    Dens Road Market Dens Road Dundee DD3 7QA

    Residential development comprising 44 dwellings and associated works.

    16 Jul 2026 Full applications