Planning application
Unit A1 Kingsway West Retail Park 467 Clepington Road Dundee DD3 8RX
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
External alterations and installation of cycle storage
As published by the council, reference 23/00031/FULL
Application record
- Reference
- 23/00031/FULL
- Type
- Full Application Local
- Status
- Decided
- Decision
- Granted As published: Approved subject to conditions
- Received
- 25 Jan 2023
- Validated
- 15 Feb 2023
- Decided
- 5 Apr 2023
- Ward
- Lochee
- Parish
- No CC/NRS In Operation
- Decision by
- Delegated Decision
- Postcode
- DD3 8RX
Site history
Applications at this address on the Dundee City register
This site has had 2 applications since 2023: 2 approved, 0 refused.
-
CND/0022/2023 Granted
Unit A1 Kingsway West Retail Park 467 Clepington Road Dundee DD3 8RX
Discharge of condition 2 of planning permission 22/00472/FULL
Timeline
Dates from the published record
-
25 Jan 2023
Received by Dundee City
-
15 Feb 2023
Validated
Checked as complete and ready for consideration.
-
5 Apr 2023
Decision issued: Approved subject to conditions
-
6 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Tenpin Ltd Applicant, registered in Bedford
Active · incorporated 2003 · Bedford
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
- 06A-PROPOSED FRONT ELEVATION
- 07A-PROPOSED AND EXISTING ENTRANCE DETAILS
- 09A-PROPOSED GROUND FLOOR
- 01A-LOCATION PLAN
- 02A-SITE PLAN
- APPLICATION PDF
- 03-EXISTING ELEVATIONS
- 05-EXISTING GROUND FLOOR PLAN
- 04-EXISTING FIRST FLOOR PLAN
- 08-PROPOSED FIRST FLOOR PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Dundee City granted permission on 5 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Unit A1 Kingsway West Retail Park 467 Clepington Road Dundee DD3 8RX
Discharge of condition 2 of planning permission 22/00472/FULL
Granted Conditions 2 docs -
Retail Warehouse Kings Cross Road Dundee DD2 3PT
Replacement signage (retrospective)
Granted Advertising 7 docs -
-
336 Clepington Road Dundee DD3 8RZ
Request to discharge condition 2 of planning permission 20/00778/FULL
Granted Conditions 3 docs -
-
Other full applications
In Dundee City
-
26/00487/FULL Granted
36 Lammerton Terrace Dundee DD4 7BL
Installation of replacement door (retrospective)
-
26/00458/FULL Granted
Unit B15 Kingsway West Retail Park 467 Clepington Road Dundee DD3 8RX
Installation of external timber bin store
-
26/00477/FULL Granted
Flat 3 Argyle Place Thomson Street Dundee DD1 4LE
Change of use from vacant premises to flat (sui generis)
-
26/00478/FULL Granted
Flat 4 Argyle Place Thomson Street Dundee DD1 4LE
Change of use from vacant premises to flat (sui generis)
-
26/00592/FULL Awaiting decision
3 Seymour Avenue Dundee DD2 1HG
Formation of bay window and dormer