Planning application
7 Middlebank Crescent Dundee DD2 1HZ
Works: Extension Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alteration and Extension to Dwelling House. Replacement of Existing Garage
As published by the council, reference 09/00151/FUL
Application record
- Reference
- 09/00151/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Approved subject to conditions
- Received
- 6 Mar 2009
- Validated
- 13 Mar 2009
- Decided
- 12 May 2009
- Ward
- West End
- Parish
- West End Community Council
- Decision by
- Delegated with Head of Planning
- Postcode
- DD2 1HZ
Timeline
Dates from the published record
-
6 Mar 2009
Received by Dundee City
-
13 Mar 2009
Validated
Checked as complete and ready for consideration.
-
12 May 2009
Decision issued: Approved subject to conditions
-
23 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
3 Middlebank Crescent Dundee DD2 1HZ
Erection of extension to North elevation and dormer extensions to North and East elevations
Granted Full applications Extension Loft or dormer -
25 Hillcrest Road Dundee DD2 1JJ
Conifer x2 - Remove tree which is leaning to east and reduce stump with stump grinder
Decided Trees 12 docs -
-
Garden Ground At 17 Rockfield Crescent Dundee
Erection of dwelling in garden ground
Withdrawn Full applications New dwelling 22 docsDomestic -
87 Blackness Avenue Dundee DD2 1JN
96% historically approved · decision due ~18 Sep
Prior Notification for Windows
Awaiting decision Prior approval Windows or glazing 8 docs -
344 Blackness Road Dundee DD2 1SD
Formation of vehicle access and parking area
Granted Full applications 7 docs
Other full applications applications
In Dundee City
-
26/00451/FULL Granted
99 Monifieth Road Broughty Ferry Dundee DD5 2SL
Erection of single storey extension, installation of window roof lights and external alterations (part retrospective)
-
26/00034/FULL Granted
The Cairn Centre 12 Rattray Street Dundee DD1 1NA
Change of use from office (Class 1A) to 8 flatted dwellings (Sui Generis) and associated alterations
-
26/00210/FULL Withdrawn
Poundstretchers Ltd 50 - 60 Lochee Road Dundee DD1 5RJ
Partial demolition, erection of extensions, external alterations and sub-division of existing Class 1A premises to create 6 Class 1A units.
-
26/00522/FULL Awaiting decision
7 Montague Street Broughty Ferry Dundee DD5 2RB
Conversion of garage to garden room.
-
26/00279/FULL Granted
17A Hindmarsh Avenue Dundee DD3 7LT
Installation of door