Skip to content
PlanIndex Get alerts
Menu

Planning application

142A Queensberry Street Dumfries DG1 1BU

Granted Dumfries and Galloway 25/1576/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

INSTALLATION OF BOILER FLUE AND 2 EXTRACT FANS AND ASSOCIATED WORKS

As published by the council, reference 25/1576/FUL

Application record

Reference
25/1576/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
25 Aug 2025
Validated
9 Sep 2025
Decided
4 Nov 2025
Ward
Nith
Parish
Loreburn Community Council
Decision by
Delegated
Postcode
DG1 1BU

Timeline

Dates from the published record

  1. 25 Aug 2025

    Received by Dumfries and Galloway

  2. 9 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 4 Nov 2025

    Decision issued: Grant Conditionally

  4. 6 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Glasgow

63 applications on PlanIndex · across 12 councils · 91% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 142A Queensberry Street Dumfries DG1 1BU

    25/1575/LBC Submitted 25 Aug 2025 1m away

    PARTIALLY LATE LISTED BUILDING CONSENT FOR ALTERATIONS INCLUDING INSTALLATION OF BOILER FLUE, 2 EXTRACT FANS, SECONDARY GLAZING AND ASSOCIATED WORKS

    Granted Heritage and listed buildings Windows or glazing 19 docs
  • 17 Church Crescent Dumfries DG1 1DF

    24/0903/CLL Submitted 1 May 2024 43m away

    PLANNING CERTIFICATE APPLICATION FOR PREMISES LICENCE

    Decided Lawful development 3 docs
  • 9-11 Church Crescent Dumfries DG1 1DF

    25/1838/LBC Submitted 3 Oct 2025 57m away

    INTERNAL ALTERATIONS TO BRING ABOUT CHANGE OF USE OF OFFICES AT FIRST AND SECOND FLOORS TO 3 FLATTED DWELLINGS (SUI GENERIS)

    Granted Heritage and listed buildings 9 docs
  • 9-11 Church Crescent Dumfries DG1 1DF

    25/1790/FUL Submitted 25 Sep 2025 57m away

    CHANGE OF USE OF OFFICES AT FIRST AND SECOND FLOORS TO 3 FLATTED DWELLINGS (SUI GENERIS)

    Granted Full applications 10 docs
  • 2 - 6 Church Crescent Dumfries DG1 1EW

    26/0487/LBC Submitted 26 Mar 2026 80m away

    INSTALLATION OF AN EXTERNAL DEFIBRILLATOR CABINET AND A BLEED KIT CABINET TO SIDE ELEVATION

    Granted Heritage and listed buildings 16 docs
  • 2 - 6 Church Crescent Dumfries DG1 1EW

    24/0011/LBC Submitted 4 Jan 2024 81m away

    INSTALLATION OF REPLACEMENT SIGNAGE INCORPORATING 3NO. EXTERNALLY ILLUMINATED FASCIA SIGNS, 1NO. PROJECTING SIGN, ATM SURROUND AND SIGNAGE AND PAINTING OF PROJECTING SIGN BRACKET AND TROUGH LIGHTS

    Granted Heritage and listed buildings 18 docs

In Dumfries and Galloway

  • 26/1346/FUL Granted

    Drumjohn Power Station Castle Douglas DG7 3TJ

    ERECTION OF SINGLE STOREY BUILDING FOR USE AS WELFARE FACILITY AND INSTALLATION OF SEWAGE TREATMENT PLANT

    4 Aug 2026 Full applications
  • 26/1326/FUL Granted

    Kirkmabreck Creetown Newton Stewart DG8 7DL

    SITING OF SHEPHERDS HUT FOR USE AS SHORT TERM HOLIDAY LETTING ACCOMMODATION WITH ASSOCIATED PARKING AND INSTALLATION OF SEPTIC TANK

    31 Jul 2026 Full applications
  • 26/1539/FUL Awaiting decision

    Blackerne Farm Haugh Of Urr Castle Douglas DG7 3JQ

    ERECTION OF EXTENSION TO EXISTING AGRICULTURAL BUILDING

    2 Sep 2026 Full applications
  • 26/1538/FUL Awaiting decision

    Land Adjacent To The Old Dairy Princes Street Lochmaben

    FORMATION OF 3NO. GATED STORAGE COMPOUNDS INCLUDING THE ERECTION OF 2 METRE HIGH FENCING AND SITING OF 4NO. SHIPPING CONTAINERS AND 1NO. SHED (RETROSPECTVE)

    2 Sep 2026 Full applications
  • 26/1546/FUL Awaiting decision

    Argrennan Cottages Tongland Kirkcudbright DG7 1TY

    ALTERATIONS AND CHANGE OF USE OF FORMER DWELLINGHOUSE, STORE AND AGRICULTURAL BUILDING TO FORM DWELLINGHOUSE (CLASS 9) WITH 2NO. SELF CONTAINED BEDROOMS

    2 Sep 2026 Full applications