Planning application
Holly Cottage Barrachan Whauphill Newton Stewart DG8 9NF
Works: Loft or dormer Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
FORMATION OF PITCHED ROOF OVER EXISTING FLAT ROOF INCLUDING PITCHED ROOF DORMER AND ROOFLIGHT TO WEST ELEVATION OF DWELLINGHOUSE TO FORM FIRST STOREY DOMESTIC ACCOMMODATION
As published by the council, reference 25/1561/LBC
Application record
- Reference
- 25/1561/LBC
- Type
- Listed Building Consent
- Status
- Decided
- Decision
- Granted As published: Grant Unconditionally
- Received
- 21 Aug 2025
- Validated
- 29 Sep 2025
- Decided
- 27 Nov 2025
- Ward
- Mid Galloway And Wigtown West
- Parish
- Port William Community Council
- Decision by
- Delegated
- Postcode
- DG8 9NF
Timeline
Dates from the published record
-
21 Aug 2025
Received by Dumfries and Galloway
-
29 Sep 2025
Validated
Checked as complete and ready for consideration.
-
27 Nov 2025
Decision issued: Grant Unconditionally
-
6 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Evans Rural Architecture Agent, an architecture practice
45 applications on PlanIndex · 82% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Dumfries and Galloway granted permission on 27 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Holly Cottage Barrachan Newton Stewart DG8 9NF
FORMATION OF PITCHED ROOF OVER EXISTING FLAT ROOF TO FORM FIRST STOREY DOMESTIC ACCOMMODATION AND ERECTION OF DETACHED DOMESTIC GARAGE
Granted Full applications 9 docs
Other heritage and listed building applications
In Dumfries and Galloway
-
26/1360/LBC Granted
Lower Double Lodge Cally Gatehouse Of Fleet DG7 2DB
ERECTION OF SINGLE STOREY EXTENSION TO SOUTH ELEVATION OF DWELLINGHOUSE
-
26/0992/LBC Granted
Buccleuch Street Bridge, Dumfries (Whitesands Project (Flood Protection Scheme And Public Realm Improvements 2017))
INTEGRATION OF FLOOD WALL TO NORTHERN SIDE OF BRIDGE
-
26/1323/LBC Granted
Conchieton Kirkcudbright DG6 4TA
INSTALLATION OF 8 NO. REPLACEMENT WINDOWS WITH TIMBER DOUBLE GLAZED WINDOWS
-
26/1349/LBC Granted
133A King Street Castle Douglas DG7 1LZ
ALTERATIONS INCLUDING REMOVAL OF ATM, NIGHT SAFE AND ALL SIGNAGE
-
26/1700/LBC Awaiting decision
3 Bella Vista Powfoot Annan DG12 5PH
INSTALLATION OF ELECTRIC STORAGE HEATERS AND ROOF MOUNTED PHOTOVOLTAIC PANELS TO SOUTH-WEST ELEVATION OF DWELLINGHOUSE