Skip to content
PlanIndex Get alerts
Menu

Planning application

Ellangowan Hotel St John Street Creetown DG8 7JF

Granted Dumfries and Galloway 25/1369/LBC Listed Building Consent

Works: Extension Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

INTERNAL AND EXTERNAL ALTERATIONS INCLUDING FORMATION OF NEW WINDOW OPENING, RE-OPENING OF WINDOW OPENINGS AND ERECTION OF INFILL EXTENSION TO BRING ABOUT PARTIAL CHANGE OF USE OF HOTEL (CLASS 7) TO 7 SHORT TERM LETS (SUI GENERIS)

As published by the council, reference 25/1369/LBC

Application record

Reference
25/1369/LBC
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Grant Conditionally
Received
22 Jul 2025
Validated
3 Sep 2025
Decided
13 Mar 2026
Ward
Mid Galloway And Wigtown West
Parish
Kirkmabreck Community Council
Decision by
Delegated
Postcode
DG8 7JF

Timeline

Dates from the published record

  1. 22 Jul 2025

    Received by Dumfries and Galloway

  2. 3 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 13 Mar 2026

    Decision issued: Grant Conditionally

  4. 16 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Clive Carruthers Architecture and Planning Agent, an architecture practice

31 applications on PlanIndex · across 3 councils · 77% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Dumfries and Galloway granted permission on 13 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Dumfries and Galloway

  • 26/1360/LBC Granted

    Lower Double Lodge Cally Gatehouse Of Fleet DG7 2DB

    ERECTION OF SINGLE STOREY EXTENSION TO SOUTH ELEVATION OF DWELLINGHOUSE

    Received 5 Aug, published by the council 13 Aug 2026 Heritage and listed buildings
  • 26/0992/LBC Granted

    Buccleuch Street Bridge, Dumfries (Whitesands Project (Flood Protection Scheme And Public Realm Improvements 2017))

    INTEGRATION OF FLOOD WALL TO NORTHERN SIDE OF BRIDGE

    Received 5 Jun, published by the council 6 Aug 2026 Heritage and listed buildings
  • 26/1323/LBC Granted

    Conchieton Kirkcudbright DG6 4TA

    INSTALLATION OF 8 NO. REPLACEMENT WINDOWS WITH TIMBER DOUBLE GLAZED WINDOWS

    Received 30 Jul, published by the council 24 Aug 2026 Heritage and listed buildings
  • 26/1349/LBC Granted

    133A King Street Castle Douglas DG7 1LZ

    ALTERATIONS INCLUDING REMOVAL OF ATM, NIGHT SAFE AND ALL SIGNAGE

    Received 4 Aug, published by the council 6 Aug 2026 Heritage and listed buildings
  • 26/1700/LBC Awaiting decision

    3 Bella Vista Powfoot Annan DG12 5PH

    INSTALLATION OF ELECTRIC STORAGE HEATERS AND ROOF MOUNTED PHOTOVOLTAIC PANELS TO SOUTH-WEST ELEVATION OF DWELLINGHOUSE

    Received 29 Sep, published by the council 30 Sep 2026 Heritage and listed buildings