Planning application

Palnackie Harbour Palnackie

Granted Dumfries and Galloway 24/0949/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

FORMATION OF ROCK ARMOUR, RAILINGS, STEPS, CONCRETE PAD, PILE AND GANG PLANK WALKWAY LINKED TO PROPOSED FLOATING PONTOON INSTALLATION (RENEWAL OF PLANNING PERMISSION PREVIOUSLY GRANTED UNDER 20/1867/FUL)

As published by the council, reference 24/0949/FUL

Application record

Reference
24/0949/FUL
Type
Full Application
Status
Decided
Decision
Granted As published: Grant Conditionally
Received
8 May 2024
Validated
14 May 2024
Decided
15 Apr 2025
Ward
Castle Douglas And Crocketford
Decision by
Delegated

Timeline

Dates from the published record

  1. 8 May 2024

    Received by Dumfries and Galloway

  2. 14 May 2024

    Validated

    Checked as complete and ready for consideration.

  3. 15 Apr 2025

    Decision issued: Grant Conditionally

  4. 16 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Dumfries and Galloway granted permission on 15 April 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 16 Riverside Drive Palnackie DG7 1PL

    25/2218/FUL Submitted 4 Dec 2025 250 yards away

    ERECTION OF DETACHED DOMESTIC GARAGE

    Granted Full applications 7 docs
  • Glenisle Inn Palnackie Castle Douglas DG7 1PG

    20/0985/FUL Submitted 2 Jul 2020 300 yards away

    ALTERATIONS INCLUDING FORMATION OF DORMER WINDOW, INSTALLATION OF EXTERNAL STAIRCASE, ALTERATION TO EXISTING DORMER WINDOW AND FORMATION OF DOOR OPENING AT FIRST FLOOR LEVEL ON WEST ELEVATION

    Granted Full applications Loft or dormer Windows or glazing 17 docs
  • Glen Road Palnackie DG7 1PH

    25/0131/FUL Submitted 23 Jan 2025 350 yards away

    94% historically approved · decision due ~20 Mar

    FORMATION OF ACCESS ROADS AND SUDS

    Awaiting decision Full applications 23 docs

In Dumfries and Galloway

  • 26/1636/FUL Awaiting decision

    Gates Power Transmission Tinwald Downs Road Heathhall Dumfries DG1 1TS

    SITING OF A PORTACABIN FOR A TEMPORARY PERIOD OF 5 YEARS TO BE USED AS STAFF CANTEEN/CHANGING AREA

    Received 16 Sep, published by the council 19 Sep 2026 Full applications
  • 26/1200/FUL Granted

    Land Between Luce Bay Avenue And Piggery Road Sandhead DG9 9DB

    ERECTION OF 3 DWELLINGHOUSES (CLASS 9), FORMATION OF VEHICULAR ACCESS AND ASSOCIATED WORKS

    Received 8 Jul, published by the council 29 Jul 2026 Full applications
  • 26/1177/FUL Granted

    11 Grummel Court Lochmaben DG11 1QR

    ALTERATIONS AND AMALGAMATION OF 1NO. DWELLINGHOUSE (CLASS 9) AND 1NO. FLATTED DWELLING (SUI GENERIS) INTO 1 NO. DWELLINGHOUSE (CLASS 9)

    Received 3 Jul, published by the council 29 Jul 2026 Full applications
  • 26/1635/FUL Awaiting decision

    Trevellas Vendace Drive Lochmaben DG11 1QN

    ERECTION OF SINGLE STOREY EXTENSION TO SOUTH-WEST ELEVATION OF DWELLINGHOUSE

    Received 15 Sep, published by the council 16 Sep 2026 Full applications
  • 26/1627/FUL Awaiting decision

    Unit 1, Commerce Road Stranraer DG9 7DD

    CONTINUED USE OF GENERAL INDUSTRIAL BUILDING (CLASS 5) AS RETAIL UNIT (CLASS 1A)

    Received 15 Sep, published by the council 16 Sep 2026 Full applications